To replace the component, reverse the removal procedure.
Removing and replacing the primary or secondary PCIe riser
cages
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless all PCI slots have
either an expansion slot cover or an expansion board installed.
Procedure
1.
Power down the server (
on page 36).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Disconnect any external cables that are connected to the expansion board.
4.
Do one of the following:
• Extend the server from the rack (
Extend the server from the rack
on page 37).
• Remove the server from the rack (
Remove the server from the rack
on page 37).
5.
Remove the access panel (
on page 39).
6.
Disconnect any internal cables that are connected to the expansion board.
7.
If any full-length expansion boards are installed, release the full-length expansion board retainer (
the full-length expansion board retainer
on page 39).
8.
Remove the PCIe riser cage.
Removing and replacing the primary or secondary PCIe riser cages
45
Содержание ProLiant DL380
Страница 31: ...Customer self repair 31 ...
Страница 32: ...32 Customer self repair ...
Страница 33: ...Customer self repair 33 ...
Страница 34: ...34 Customer self repair ...
Страница 106: ...106 Component identification ...
Страница 116: ...LFF models Cable routing Front 8SFF drive options Box 1 to SAS Expander 116 Cable routing Front 8SFF drive options ...
Страница 117: ...Box 2 to SAS Expander All boxes Cabling 117 ...
Страница 119: ...Box 2 Box 3 Cabling 119 ...
Страница 120: ...Cable routing Front 2SFF NVMe drive option for SFF 120 Cable routing Front 2SFF NVMe drive option for SFF ...