Installing a Smart Storage Battery option
For more information about the integrated storage controller and its features, select the relevant user
documentation on the
Hewlett Packard Enterprise website
CAUTION:
In systems that use external data storage, be sure that the server is the first unit to be powered down
and the last to be powered back up. Taking this precaution ensures that the system does not
erroneously mark the external drives as failed when the server is powered up.
Procedure
1.
2.
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
•
Extend the server from the rack
•
Remove the server from the rack
.
5.
.
6.
.
7.
Remove the slot covers.
8.
Install the Smart Storage Battery holders.
Installing a Smart Storage Battery option
51
Содержание ProLiant DL20 Gen9
Страница 16: ... Two bay LFF hot plug drive model Four bay SFF hot plug drive model 16 Component identification ...
Страница 88: ... Four bay SFF hot plug configuration Two bay LFF non hot plug configuration 88 Cabling ...
Страница 90: ...Optical drive cabling Two bay LFF configuration Four bay SFF configuration 90 Optical drive cabling ...
Страница 120: ...120 Support and other resources ...