Version 1.0 (April 2020)
Страница 1: ...Version 1 0 April 2020...
Страница 2: ...control the production of a single photovoltaic module directly consequently improving the flexibility and reliability of the system About the Manual This manual contains important instructions for t...
Страница 3: ...oduction 8 3 4 Dimension mm 8 4 About Function 9 4 1 Work Mode 9 5 About Installation 9 5 1 Accessories 9 5 2 Installation Precaution 9 5 3 Space Distance Required 10 5 4 Preparation 10 5 5 Installati...
Страница 4: ...r Quality Response Modes 23 8 3 DRM 23 9 Technical Data 23 9 1 DC Input 24 9 2 AC Output 24 9 3 Efficiency Safety and Protection 24 9 4 Mechanical Data 25 9 5 Features 25 Appendix 1 26 Installation Ma...
Страница 5: ...The safety symbols in this user manual are show as below 2 About Safety 2 1 Important Safety Instructions The HM 500 HM 600 HM 700 HM 800 Microinverter is designed and tested according to internation...
Страница 6: ...switches and Over current Protection Devices OCPD Only one photo voltaic module can be connected to one input of the inverter Do not connect batteries or other sources of power supply The inverter can...
Страница 7: ...limits for CE EMC which can provide reasonable protection against harmful energy However if not installed according to the instructions the microinverter may cause harmful interference to radio equipm...
Страница 8: ...fficiency 96 70 in 2015 3 2 Highlights Maximum output power up to 500W 600W 700W 800W Adapted to 60 72 cells PV panels Peak efficiency 96 70 CEC weighted efficiency 96 50 Static MPPT efficiency 99 80...
Страница 9: ...ion is contradicted with Microinverter operating requirement No house loads or the Export control value has been set as 0 on the DTU under the Zero Export Control mode 5 About Installation 5 1 Accesso...
Страница 10: ...llation of the equipment is carried out based on the system design and the place in which the equipment is installed The installation must be carried out with the equipment disconnected from the grid...
Страница 11: ...conceived for photovoltaic modules supplied by installation technicians Install Microinverter underneath of the photovoltaic modules to make sure it works in theshadow If this condition cannot be met...
Страница 12: ...to form a continuous AC branch circuit Note The length of AC cable on Microinverter is around 2 06m if the distance between two Microinverters is more than 1 2m please use the AC extension cable betw...
Страница 13: ...as AC end cable 3 Plug the AC port Part 2 into Part 1 once complete the wiring and screw the Part 3 on and complete the AC extension cable B Connect the AC end cable to the AC male connector of the f...
Страница 14: ...800 B Affix the serial number label to the respective location on the installation map Please refer to the appendix for the installation map Step 5 Connect PV Modules A Mount the PV modules above the...
Страница 15: ...protection 1 Check the ventilation and ambient temperature at the microinverter installation position 2 If the ventilation is poor or the ambient temperature exceeds the limit improve the ventilation...
Страница 16: ...e grid voltage may be abnormal temporarily The microinverter can recover automatically after grid voltage becomes normal 2 If the alarm occurs frequently check whether the grid voltage is within the a...
Страница 17: ...her there is a power grid outage 148 Grid disconnection Please check whether the AC switch or AC wiring is normal 149 Island detected 1 If the alarm occurs accidentally the grid voltage may be abnorma...
Страница 18: ...or Hoymiles technical support 304 Hardware Error Code 304 1 If the alarm occurs accidentally and the microinverter can still work normally no special treatment is required 2 If the alarm occurs freque...
Страница 19: ...reported to the DTU refer to the local APP of the DTU or Hoymiles Monitoring Platform for more information 6 3 On site Inspection For qualified installer only To troubleshoot an inoperable microinver...
Страница 20: ...ent if any problems are found and restore the normal conditions after the fault removed 5 Conduct an annual inspection on various components and clean the equipment with a vacuum cleaner or special br...
Страница 21: ...Use the AC disconnect tool to remove the AC connectors Un screw the fixing screw on the top of the microinverter and remove the microinverter from the PV racking b How to replace the Microinverter Ple...
Страница 22: ...ed Once receiving the Microinverter it is necessary to check the container for any external damage and verify receipt of all items Call the delivering carrier immediately if damage or shortage is dete...
Страница 23: ...nverter output power varies in response to the voltage at its terminal This mode can be enabled via gridprofile module on Hoymiles monitoring platform Please refer to document HMP Operating Guide Webp...
Страница 24: ...l Up to 440 singe panel Up to 500 singe panel Peak power MPPT voltage range V 27 48 29 48 33 48 34 48 Start up voltage V 22 22 22 22 Operating voltage range V 16 60 16 60 16 60 16 60 Maximum input vol...
Страница 25: ...ture range 40 65 40 65 40 65 40 65 Storage temperature range 40 85 40 85 40 85 40 85 Dimensions W H D mm 250 170 28 250 170 28 250 170 28 250 170 28 Weight kg 3 00 3 00 3 00 3 00 Enclosure rating Outd...
Страница 26: ...2019 Hoymiles Converter Technology Co Ltd All rights reserved 26 HM 500 HM 600 HM 700 HM 800 Appendix 1 Installation Map...
Страница 27: ...2 WIRING DIAGRAM 230VAC SINGLE PHASE UP TO 6 HM 800s PER AC BRANCH CIRCUIT GROUND NEUTRAL W AC DISTRIBUTION PANEL OR SUBPANEL METER AC BRANCH CABLE BROWN L BLUE N YELLOW GREEN G BRANCH END CAP L1 PHA...
Страница 28: ...PER AC BRANCH CIRCUIT UP TO 6 HM 800s PER AC BRANCH CIRCUIT UP TO 6 HM 800s PER AC BRANCH CIRCUIT GROUND NEUTRAL W AC DISTRIBUTION PANEL OR SUBPANEL METER AC BRANCH CABLE BROWN L BLUE N YELLOW GREEN...