8.5  Installation

 Caution

Risk of injury caused by falling load and improper handling. During 

installation:

–  Wear personal protective equipment.

–  Do not stand under suspended loads.

–  Use cranes or forklifts with sufficient load-bearing capacity.

Preparation

 

Make sure that a lifting platform is available.

 

Remove the packaging film. 

 

For mounting, use the enclosed rivet nuts and

 

the optionally available suspension set or

 

flat irons, perforated irons, angle profiles or similar

Ceiling mounting TopVent

®

 TG, GV, MG

 

Insert the roof feed-through of the flue gas kit in the roof opening.

 

If necessary, shorten the concentric pipe of the roof feed-through as 

 appropriate in order to adapt it to the particular conditions required.

 

Transport the unit to the installation site.

 

Mount the suspension set on the designated suspension points.

 Caution

Risk of injury from falling parts. Only fasten the unit at the designated 

suspension points. Do not place any suspension points on the filter box, 

mixed air box or recirculation silencer.

 

Attach the unit to the ceiling.

 

Install the device horizontally.

 

Do not attach any additional loads.

 

Do not use eyebolts.

 

Non-vertical suspensions are permissible up to a maximum angle of 45°.

 45°

 45°

Fig. 14:  Non-vertical suspension

 

TopVent

®

 MG:

 

Connect supply air units to the fresh air duct via a canvas connection and 

connect both flanges with an earth wire.

 

Attach the flue gas accessories to the unit.

 

Do not use lubricants.

 

Perform all pipe connections gas-tight.

 

If necessary adjust the pipe lengths to the local conditions.

Fig. 11:  TopVent

®

 TG installation

Fig. 12:  TopVent

®

 GV installation

Fig. 13:  TopVent

®

 MG installation

24

TopVent

®

 TG | GV | MG

Operating instructions

Transport and installation

4 220 656-en-03

4 220 656-en-03

Содержание TopVent GV

Страница 1: ...TopVent TG GV MG Operating instructions TopVent TG GV MG Original operating manual 4220656 en 03...

Страница 2: ...1 Scope of delivery 20 8 2 Storage 20 8 3 Requirements for the installation site 21 8 4 Flue gas evacuation and combustion air supply 23 8 5 Installation 24 8 6 Gas connection 25 8 7 Electrical insta...

Страница 3: ...gas fired heat exchanger Fresh air supply Mixed air operation Recirculation operation Air distribution and destratification with adjustable Air Injector Air filtration The units comply with all the re...

Страница 4: ...heir knowledge of the relevant regulations and guidelines can carry out the work assigned to them and recognise potential hazards Please read the operating instructions before unpacking installing com...

Страница 5: ...Fire hazard due to hot components Do not switch off the power supply until the fan comes to a complete stop When the fan comes to a stop switch off the plant on the main switch 2 4 Emergency situatio...

Страница 6: ...nt GV 1 Fan unit 2 Heating section with integrated control box 3 Air outlet louvre Fig 2 TopVent GV components 1 3 4 2 1 3 2 TopVent MG 1 Mixed air box 2 Filter box 3 Fan unit 4 Unit control box 5 Hea...

Страница 7: ...ensor 4 Gas fired heat exchanger 5 Air outlet louvre 6 Supply air Fig 5 TopVent GV function diagram TopVent MG 5 6 7 8 9 10 1 2 3 4 1 Fresh air 2 Fresh air damper with actuator 3 Recirculation damper...

Страница 8: ...rate Fan speed 1 Fresh air damper 10 open 1 Heating on 2 1 Percentage is adjustable 2 Depending on heat demand REC Recirculation On off operation If heating is required the unit draws in room air hea...

Страница 9: ...oller operates in one of the following programs as desired Automatic mode with setpoint changeover according to clock programme Continuous operation with the room temperature setpoint day Continuous o...

Страница 10: ...without LH Standard paint finish LU Paint finish as desired Silencer without U Recirculation silencer A Acoustic cowl UA Recirculation silencer and acoustic cowl Flue gas kit without F Flue gas kit f...

Страница 11: ...jector Installation without S Suspension set Paint finish without LH Standard paint finish LU Paint finish as desired Silencer without A Acoustic cowl Flue gas kit without F Flue gas kit flat roof P F...

Страница 12: ...ction Unit type TG 6 MG 6 TG 9 MG 9 GV 3 GV 5 Supply voltage V AC 3x 400 3x 400 230 230 Permitted voltage tolerance 5 5 10 15 10 15 Frequency Hz 50 50 50 50 Power consumption max W 1360 1960 300 750 C...

Страница 13: ...ow 2 m 45 elbow 1 m 90 T piece 2 m Table 11 TopVent GV gas circuit connections 6 5 Sound levels TopVent TG MG Unit type TG 6 TG 9 MG 6 MG 9 Sound pressure level at a dist of 5 m 1 dB A 47 49 55 57 Tot...

Страница 14: ...spection door with measuring opening for combustion air temperature 4 Gas connection TG 6 G TG 9 G 5 Unit control box A mm 900 1100 B mm 500 630 C mm 1565 1672 D mm 1490 1570 E mm 1000 1000 F mm 946 1...

Страница 15: ...M 1 0 M 10 400 73 546 144 650 325 470 90 670 170 117 112 108 105 G 1 2 3 Unit type GV 3 GV 5 1 Gas connection 2 Combustion air connection DN 80 3 Flue gas connection DN 80 Weight kg 40 80 Fig 8 TopVe...

Страница 16: ...combustion air temperature 4 Gas connection MG 6 G MG 9 G 5 Unit control box 6 Fresh air duct connection A mm 900 1100 B mm 500 630 C mm 2246 2333 D mm 490 570 E mm 1000 1000 F mm 946 1019 G mm 836 9...

Страница 17: ...filtration For hygiene reasons Hoval recommends always fitting TopVent TG units with a filter Filter box A filter box with 2 bag filters can be installed for the purpose of filtering the recirculation...

Страница 18: ...rential pressure switches Pa 50 50 Table 16 Flat filter box technical data 7 4 Paint finish If the customer wishes the units can be provided with an exterior paint finish 7 5 Recirculation silencer Th...

Страница 19: ...0 250 125 150 50 45 660 865 1850 405 780 150 250 50 180 110 125 Appropriate for roof inclinations between 25 and 45 Components Roof feed through Flat roof flange Flue gas pipe T piece Condensate cap E...

Страница 20: ...ng optional components are supplied separately Additional room temperature sensors in the zone control panel Zone control panel C SYS Room temperature controller TempTronic MTC Preparation Use a forkl...

Страница 21: ...e free to spread out unhindered The access panels in the unit must be freely accessible The unit must be accessible for maintenance work The connecting lines must be able to be dismantled Make sure th...

Страница 22: ...ing TopVent GV horizontal air flow X 2 X Y 1 W V 1 Free space to open inspection door Size 3 5 Unit clearance X min m 7 0 10 0 max m 12 0 16 0 Mounting height Y min m 1 7 1 7 max m 5 0 6 0 Distance fr...

Страница 23: ...ure of the flue gas pipes amounts to 200 C During the planning process please observe the regulations of the responsible fire protection authorities For the flue gas path test Hoval recommends install...

Страница 24: ...te Mount the suspension set on the designated suspension points Caution Risk of injury from falling parts Only fasten the unit at the designated suspension points Do not place any suspension points on...

Страница 25: ...ed quantity of gas and the necessary pressure of gas must be present constantly Connect the gas supply line with appropriate bolted joints which can be loosened tension free and vibration free gas hos...

Страница 26: ...must be easily removable TopVent TG MG GV with TopTronic C Connect the power supply to the unit control box Connect the zone bus to the unit control box TopVent MG Make sure that the ground cable is i...

Страница 27: ...e no effect J14 S1 1 TopVent 2 TopVent 3 TopVent 1 1 0 ON 2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 0 1 0 Fig 18 Addressing the units Fig 19 Location of the S1 and J14 switches on the burn...

Страница 28: ...al installation Power supply for indoor climate units zone control panels Laying of bus cables conforming to wiring diagram Installation and wiring of all sensors room temperature sensor fresh air sen...

Страница 29: ...Status Description 0 Standby Waiting for heat demand 1 Reset Software reset 3 Pre check Zero position check pressure switch 4 Pre purge 30 s pre ventilation by the gas blower 5 Pre ignition Ignition w...

Страница 30: ...A flue gas analyser is required which records the following measured values CO concentration of the flue gas CO2 concentration of the flue gas Combustion air temperature Flue gas temperature Flue gas...

Страница 31: ...value too low Turn the adjuster 2 to the right CO2 value too high Turn the adjuster 2 to the left Return to full load operation and readjust the CO2 value with the adjuster 1 Return to partial load op...

Страница 32: ...s blower does not work 6 L 6 and 7 6 and 7 Gas blower error Gas blower rotates at the wrong speed 7 L 8 to 12 8 to 12 Internal error Internal error 13 L 13 13 Pressure switch error Pressure switch is...

Страница 33: ...t 4 E 34 134 Reset button error Too many reset actions in a short time span 9 E 36 136 Overheating Heat exchanger sensor is overheated 3 E 38 and 39 138 and 139 Heat exchanger sensor error Heat exchan...

Страница 34: ...of the gas valve Case 4 Heat exchange sensor or flue gas sensor not detected or short circuit The heat exchange sensor consists of 2 internal sensors The readings of these sensors may differ too much...

Страница 35: ...he hose Case 15 Flame detected after closing the gas valve Check if the gas valve closes too slow If so Replace the gas valve Check if the ionisation electrode is wet If so Dry clean or replace the el...

Страница 36: ...gh gas mixture from entering the burner Check the flue gas system for blockage Check the burner for dust or other pollution Non modulating system fan TopVent GV Check the functioning of this fan by co...

Страница 37: ...s The unit controller and the service socket are still live After switching off Always wait at least 3 minutes Caution The use of condensers can pose a danger of fatal injury from directly touching li...

Страница 38: ...nition and ionisation electrode If necessary carefully clean with fine sandpaper and readjust Replace burner flange in the event of corrosion or material fatigue Visual inspection of the heat exchange...

Страница 39: ...lat filter box Remove the filter elements from above Insert the new filter elements Dispose of the filters in accordance with local regulations The disposal of used filters depends on the contents 12...

Страница 40: ...switch off the plant on the main switch Caution Danger of electric shocks The unit controller and the service socket are still live After switching off Always wait at least 3 minutes Caution The use...

Страница 41: ...41 4220656 en 03 Notes...

Страница 42: ...42 4220656 en 03 Notes...

Страница 43: ...43 4220656 en 03...

Страница 44: ...Hoval Aktiengesellschaft 9490 Vaduz Liechtenstein Tel 423 399 24 00 info klimatechnik hoval com www hoval com United Kingdom Hoval Ltd Northgate Newark Notts NG24 1JN Tel 01636 672711 hoval hoval co...

Отзывы: