39
4 219 316 / 00
DECOMMISSIOnInG
5.
Decommissioning
The following measures must be taken if the boiler is
to be taken out of operation for several weeks:
Where there is a frost hazard, have the system drained as
prescribed by the heating installer or add frost protec tion
agent in accordance with the heating installer’s instruc tions.
Содержание TopGas classic 100
Страница 46: ...46 4 219 316 00...
Страница 47: ...47 4 219 316 00...