background image

2.  

WIRING TO THE DOOR CONTROLLER

3.

 DIPSWITCH SETTINGS

1

1. 

MOUNTING THE SSS-5 ON THE DOOR 

SSS-5: Quick Installation Guide

2

2

NO

3

1/ Test Input

2/ Optical Interference

2/

 Use a weather cover if the 

unit is installed where rain will 

fall directly on it.

PCB Unit   

4/ 

Remove the Angle Stabilizer and loosen the screw on 

one of the PCB Holders to slide it aside and remove the 

PCB Unit.

Angle Stabilizer

PCB 
Holder

5/ 

Attach the Aluminium

 

Case to the door with the screws provided.The Aluminum Case(s) 

should be located close to the Leading edge of the door to maximise safety detection.

Aluminum 
Case

torque  
0.5 Nm

LEADING 

EDGE 

MARK

Leading Edge 
of Door

6/

 Reinsert the PCB unit, making sure that the side marked 

LEADING 

EDGE

 is closest to the leading edge of the door. Re-attach the Angle 

Stabilizer and tighten the screws on the PCB Holders.

1/ 

Drill Holes as indicated and install the 

Jamb Hole Cover A on the door 
controller

Unit : [mm]

30

10 

15

Screw Holes Wiring Hole

3 - 

φ

2.6

φ

10

1

7

A

50mm

Check that the detection range 
conforms to EN16005

EN16005

B

A

A

Without TEST

With

 

TEST    

0v

B

Without  TEST

0v

A

B

SSS-5

SSS-5

3/ Relay Output Mode

3

NC

4/ Masking Detection Spots

4

5

1

2

3

4

5

6

4

5

1

2

3

4

5

6

4

5

1

2

3

4

5

6

4

5

1

2

3

4

5

6

5/ Setting Non-Detection Distance

6

7 8

100mm

6

7 8

150mm

6

7 8

200mm

6

7 8

6

7 8

300mm

6

7 8

400mm

6

7 8

500mm

6

7 8

250mm

Terminal 

Block

To avoid cross interference between two 

sensors in close proximity different 
frequency settings should be selected

Door

 Leaf

D

ete

ct

io

n

A

Set Non-Detection 
distance

Power supply ( AC/DC 12

24[V] )

  Relay Output ( Common )

  Relay Output 1

 Relay Output 2 (Second PCB Unit Output)

2
3
4

1

5

  TEST Input ( - )

6

  TEST Input ( + )

7

Hinge

Extra Wire Hole through the door

Jamb Hole Cover Wire Sheath

Door

 

Cont

ro

ll

er

Connector 6P

PCB Unit1

7P Terminal 

PCB Unit2

7P Terminal 

Unused

PCB units are connected to each 
other using the Communication 
Cable (supplied)

Slide SW

OFF

Hole(

φ

10) drilled 

through the door.

Hinge

Jamb Hole Cover

ON

PCB Unit1

7P Terminal 

OFF

PCB Unit2

7P Terminal 

OFF

Door

 

Cont

ro

ll

er

Note:

 Remember to set the Slide SW as indicated

4/ Option 1: 

Plan view, wiring PCB units on both side of the door independently 

back to the door controller 

4/ Option 2: 

PCB units on both sides of the door connected via communication 

cable and only 1 PCB unit wired back to door controller 

2/ 

Clamp the Wire Sheath between the Jamb 

Hole Cover A/B

Jamb Hole 

Cover A

Jamb Hole

Cover B

Wires to 

the controller

Wire Sheath

1/ 

Do not mount the sensor 

higher than 2.6 [m]( 8' 6" ).

 

2.6 [m]

Hinge

<Top view>

Leading edge

Hinge

Leading edge

3/

 Unscrew the Side Covers and remove 

the Filter Cover.

Side Cover

Filter Cover

Aluminium Case

3/ 

Remove the Terminal Block from the PCB unit and connect the wires 

from the door controller to it as indicated. See wiring options below.

Communication 

Cable

PCB unit

 = Default Setting

When connected to a door controller 

with a TEST input, set to “B

.

When connected to a door controller 

without a TEST input, set to “A

Set to 

B

 to comply with EN16005

EN16005

 Default 

Settings

2

1

3 4 5 6 7 8

Tighten screw 
PCB Holders

Note:

 Remember to set the Slide SW as indicated

L

eading

Edge

L

eading

Edge

Отзывы: