2.
WIRING TO THE DOOR CONTROLLER
3.
DIPSWITCH SETTINGS
1
1.
MOUNTING THE SSS-5 ON THE DOOR
SSS-5: Quick Installation Guide
2
2
NO
3
1/ Test Input
2/ Optical Interference
2/
Use a weather cover if the
unit is installed where rain will
fall directly on it.
PCB Unit
4/
Remove the Angle Stabilizer and loosen the screw on
one of the PCB Holders to slide it aside and remove the
PCB Unit.
Angle Stabilizer
PCB
Holder
5/
Attach the Aluminium
Case to the door with the screws provided.The Aluminum Case(s)
should be located close to the Leading edge of the door to maximise safety detection.
Aluminum
Case
torque
0.5 Nm
LEADING
EDGE
MARK
Leading Edge
of Door
6/
Reinsert the PCB unit, making sure that the side marked
“
LEADING
EDGE
”
is closest to the leading edge of the door. Re-attach the Angle
Stabilizer and tighten the screws on the PCB Holders.
1/
Drill Holes as indicated and install the
Jamb Hole Cover A on the door
controller
Unit : [mm]
30
10
15
Screw Holes Wiring Hole
3 -
φ
2.6
φ
10
1
7
A
50mm
Check that the detection range
conforms to EN16005
EN16005
B
A
A
Without TEST
With
TEST
0v
B
Without TEST
0v
A
B
SSS-5
SSS-5
3/ Relay Output Mode
3
NC
4/ Masking Detection Spots
4
5
1
2
3
4
5
6
4
5
1
2
3
4
5
6
4
5
1
2
3
4
5
6
4
5
1
2
3
4
5
6
5/ Setting Non-Detection Distance
6
7 8
100mm
6
7 8
150mm
6
7 8
200mm
6
7 8
6
7 8
300mm
6
7 8
400mm
6
7 8
500mm
6
7 8
250mm
Terminal
Block
To avoid cross interference between two
sensors in close proximity different
frequency settings should be selected
Door
Leaf
D
ete
ct
io
n
A
Set Non-Detection
distance
Power supply ( AC/DC 12
~
24[V] )
Relay Output ( Common )
Relay Output 1
Relay Output 2 (Second PCB Unit Output)
2
3
4
1
5
TEST Input ( - )
6
TEST Input ( + )
7
Hinge
Extra Wire Hole through the door
Jamb Hole Cover Wire Sheath
Door
Cont
ro
ll
er
Connector 6P
PCB Unit1
7P Terminal
PCB Unit2
7P Terminal
(
Unused
)
PCB units are connected to each
other using the Communication
Cable (supplied)
Slide SW
「
OFF
」
Hole(
φ
10) drilled
through the door.
Hinge
Jamb Hole Cover
「
ON
」
PCB Unit1
7P Terminal
「
OFF
」
PCB Unit2
7P Terminal
「
OFF
」
Door
Cont
ro
ll
er
Note:
Remember to set the Slide SW as indicated
4/ Option 1:
Plan view, wiring PCB units on both side of the door independently
back to the door controller
4/ Option 2:
PCB units on both sides of the door connected via communication
cable and only 1 PCB unit wired back to door controller
2/
Clamp the Wire Sheath between the Jamb
Hole Cover A/B
Jamb Hole
Cover A
Jamb Hole
Cover B
Wires to
the controller
Wire Sheath
1/
Do not mount the sensor
higher than 2.6 [m]( 8' 6" ).
2.6 [m]
Hinge
<Top view>
Leading edge
Hinge
Leading edge
3/
Unscrew the Side Covers and remove
the Filter Cover.
Side Cover
Filter Cover
Aluminium Case
3/
Remove the Terminal Block from the PCB unit and connect the wires
from the door controller to it as indicated. See wiring options below.
Communication
Cable
PCB unit
= Default Setting
When connected to a door controller
with a TEST input, set to “B
”
.
When connected to a door controller
without a TEST input, set to “A
”
.
Set to
“
B
”
to comply with EN16005
EN16005
Default
Settings
2
1
3 4 5 6 7 8
Tighten screw
PCB Holders
Note:
Remember to set the Slide SW as indicated
L
eading
Edge
L
eading
Edge