9
PLEASE PHONE US TO REGISTER YOUR APPLIANCE AND ACTIVATE YOUR PARTS GUARANTEE ON 08448 24 24 24
INSTALLATION INSTRUCTIONS
UNPACKING THE COOKER
Unpack the components from inside the grill and oven. Check that the following parts are present:
Grill pan and grid
Main oven shelves (2)
Top oven/grill shelf (1)
Pan supports
Baking dish
Enamelled burner caps (4)
Aluminium burner bodies (4) Literature
LEVELLING
Four skid feet are fitted which can be adjusted up or down to level the cooker.
CONVERSION FOR USE ON BUTANE (G30) OR PROPANE (G31)
Each burner requires the injector to be replaced and bypass screws adjusted or replaced as follows:
1. Remove the loose hotplate burner parts.
2. Using a 7mm socket, replace the hotplate injectors as appropriate (see table on previous page).
3. Re-position the loose burner parts.
4. Carefully pull off the hotplate control knobs.
5. Using a narrow flat bladed screwdriver rotate the bypass screws fully clockwise. The hotplate tap bypass
screws are located down the centre of the spindle.
6. Re-assemble the control panel parts.
7. Secure the self-adhesive LPG conversion label over the gas details on the data badge.