25
G. Final Checklist
1) Is the appliance level?
2) Have the casters been properly installed and have the front casters been locked? For
PR46(-D) models, has the anti-tip bracket been properly installed and adjusted?
3) Is the appliance in a site where the ambient temperature is constantly within 45°F to
86°F (7°C to 30°C)?
4) Have the shipping carton, tape, and packing material been removed from the
appliance? Has the protective plastic film been removed from both the exterior panels
and the interior door/drawer panel?
5) Have the appliance and accessories been checked for shipping damage?
6) Is there at least 1" (3 cm) clearance at sides for proper air circulation? Are the
factory-installed rear bumpers in place to ensure proper rear clearance? Is there at least
10" (25 cm) clearance above the rail to allow the rail cover to open?
7) Have the rail dividers, pans, rail cover, cutting board brackets, and cutting board been
properly installed?
8) Has the power supply voltage been checked or tested against the nameplate rating?
Is the power supply a properly grounded, independent wall outlet? Does the electrical
connection meet all national, state, and local code and regulation requirements.
9) Have the refrigerant lines been checked to make sure they do not rub or touch other
lines or surfaces? Has the condenser fan blade been checked to make sure it turns
freely? Is the compressor securely attached?
10) Have the shelves been adjusted to the desired height?
11) Has the end user been given the instruction manual, and instructed on how to operate
the appliance and the importance of the recommended periodic maintenance?
12) Has the end user been given the name and telephone number of an authorized service
agent?
13) Has the warranty card been filled out and forwarded to the factory for warranty
registration?