Care and maintenance | 14
60026505 • 1 • 09/2020 • en
61
14.1.3 During the season
Maintenance location
Work instructions
Interval
Machine in general
Frame and frame connecting
parts
Check condition and firm seating
daily
Wear items
Replace all wear items when the
• wear limits have been reached
• change intervals have been reached
• damages
Tools
Packer
Check condition, bearing, fastening, and free rotation.
40 h
Spray the bearing locations with a suitable anticorrosive before exten-
ded idle periods.
Before recommissioning, turn the packer by hand and check for free
rotation.
Coulter and coulter fastening Check for condition, firm seating and wear
daily
Electrics
Electrical lines
Check for damage
40 h
Hydraulics
Hydraulic system and com-
ponents
Check all hydraulic components and hoses for function, leak tight-
ness, fastening and chafing.
40 h
Pneumatic system
Hydraulic connections and
hoses
Check for leaks and chafing marks
daily
Flaps automatic tram line
system
Check switching function – close and open by air draught or at the
bottom on the shaft mark.
daily
Metering unit
Safety installations
Lighting and warning boards Check condition and function
daily
Warning and safety stickers
Check that they are in place and legible
40 h
Coulter
Rubber mounting
Check condition and replace if aged or showing reduced tensioning
force.
40 h
Coulter discs
Check state, wear, bearing play and light movement. The discs must
be rotatable by hand.
40 h
Press rollers
Check for condition, tight fit and wear.
prior to use
Scrapers on coulters and
press rollers
Check for condition, tight fit and wear.
prior to use
Harrow
Check condition, firm seating, setting and wear.
prior to use