![horsch LEEB PT 330 Скачать руководство пользователя страница 126](http://html1.mh-extra.com/html/horsch/leeb-pt-330/leeb-pt-330_operating-instructions-manual_2164094126.webp)
11. Sprayer unit
11.1 General design and
function
11.1.1 Control unit
External terminal and illuviation valve are ar-
ranged in travel direction on the left hand side.
External control terminal and illuviation valve
NOTE
The stowage box is located to the left of this.
Store your personal protective equipment here!
11.1.2 Connections
Overview of connections
1
2
3
4
5
1
Pressure filter
2
Centrifugal pump suction filter
3
Suction connection for solution tank filling
4 Filling port for fresh water tank
5 Spraying mixture tank residue drain
126
Содержание LEEB PT 330
Страница 4: ......
Страница 6: ......
Страница 33: ...1 17 Position of safety stickers 33...
Страница 34: ...34...
Страница 173: ...NOTE Lubricate the lubrication points on the folding boom every 50 operating hours or once every week 173...
Страница 187: ...Diagram a with example 187...
Страница 201: ...201...
Страница 202: ......