120
After the first travel under load
Component
maintenance work
workshop work
wheels
Wheel nut inspection
hydraulic system
Check for leaks
spraying pump
Check for leaks
Daily
Component
maintenance work
workshop work
Complete machine
Check for apparent faults
spraying pump
Solution tank
pressure filter
suction filter
dome screen
Line filters in the nozzle lines
(if present)
Spraying nozzles
Clean, flush
Brake
Drain the compressed air vessel
Weekly / 50 operating hours
Component
maintenance work
workshop work
wheels
Check the air pressure
hydraulic system
Check for leaks
X
Pneumatic system
Check for leaks
Check oil level in lubricator
Water system / hoses
Check for leaks
Folding boom / parallelogram
Visual inspection of folding joints for zero
clearance, apparent faults and wear
In case of play or lose components have
faults corrected by the Customer Service
of HORSCH.
X
Straps of fresh water tank
(see 9.10)
Check tightening torque 3.5 Nm, retight-
en if necessary
Straps of solution tank
(see 9.10)
Check tightening torque 7 Nm, retighten
if necessary
Spraying pump type ACE FMC
750F- HYD M22
Check pressure on pressure gauge
(2 bar); in case of pressure drop check oil
level and fill up as necessary (see 3.5).
9.6 Service and maintenance plan
Match your maintenance intervals to the date reached first.
The time intervals, mileage or maintenance intervals specified in the possibly supplied documentation
from external manufacturers should be treated with priority. Lubrication plan see 9.3.
As far as service and maintenance tasks under “Workshop work” are marked with “X”,
they must only be carried out by an expert workshop (see 1.3).
Содержание Leeb 6 GS
Страница 4: ......
Страница 6: ......
Страница 38: ...38 2 2 Safety features and protections Boom rest for inside wings Folding lock Railing for working platform...
Страница 123: ...123 Fig 9 3 1a Fig 9 3 1 c Fig 9 3 1 d Fig 9 3 1 f Fig 9 3 1b Fig 9 3 1 e...
Страница 140: ...140 Diagram a with example...
Страница 147: ...147...
Страница 152: ......
Страница 153: ......