![horsch Leeb 5.280 VL Скачать руководство пользователя страница 231](http://html1.mh-extra.com/html/horsch/leeb-5-280-vl/leeb-5-280-vl_operating-instructions-manual_2164087231.webp)
Spraying operation
Turn the pressure valve
(26)
to spraying
oper
-
ation.
In
spraying
operation
the
sucked
in
fluid
is
di
-
rected
through
the
pressure
filters
(39,
40)
and
the flow meter
(42)
into the folding boom
(45)
.
The circulation
valve
(43)
is in position
(a)
, so
that pressure builds
up in the spraying
line and
the wash is pressed
to the nozzles
from both
sides.
a
b
Circulation
With
the
nozzles
switched
off,
the
circulation
valve
(43)
is in position
(b)
, so that the wash
flows
through
the
circulatio
n
system
back
into
the
spraying mixture container.
This
prevents
the formation of deposits. Wash is immediately available at the nozzles when switching on. Due
to the permanent
circulation
of the biocata
-
lytic solut
ion through the complete spraying line,
wash is constantly present at all nozzles while
the nozzles are switched off.
Even when switching on individual sections or
the
entire
spraying
line
for
the
first
time,
the
biocatalytic
solution
is directly and well
mixed
available. This circulation successfully prevents the forma
-
tion of deposits and blockage.
226
227
Содержание Leeb 5.280 VL
Страница 2: ......
Страница 5: ......
Страница 11: ...7...
Страница 199: ...Vehicle GPS antenna calibration With standard tyres VF520 85 R46 Tyre radius 915 mm Track width 195...
Страница 219: ...Diagram a with example 215...
Страница 225: ...221...
Страница 228: ...5 1 2 8 9 10 13 12 23 26 28 224...
Страница 230: ...26 39 40 42 43 45 226...
Страница 234: ...44 1 2 5 8 9 10 16 25 12 14 230...
Страница 236: ...44 50 45 44 47 48 232...
Страница 279: ...Central frame middle frame tractor link arm Parallelogram lock 275...
Страница 307: ......