![horiba HU-200TB-W SS-120-W Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/horiba/hu-200tb-w-ss-120-w/hu-200tb-w-ss-120-w_instruction-manual_2162226016.webp)
Overview
4
Names and functions of each part
Converter
Front panel
With front cover opened
Display section
The measured value and
other information are dis-
played here.
When the cover is opened, six opera-
tion keys appear.
Up to six electric wires of 9 mm to
11.5 mm in diameter can be used.
Purge air is sent through this inlet to
prevent internal corrosion. Normally
no connection is required.
Conduit
Cover
This cover is used for
outdoor installation.
Front cover
Purge air inlet
Screw cap
When the two screw caps are removed,
the front case screws appear.
When the four screws are removed,
the front case can be opened.
Front case screw
Six operation keys are provided.
Operation key section
Front case
Содержание HU-200TB-W SS-120-W
Страница 1: ...Turbidity meter HU 200TB W SS 120 W Instruction Manual CODE GZ0000361148F ...
Страница 12: ......
Страница 99: ...Data 87 Unit Unit yES Yes USr User check menu 0 CAL Zero calibration Display Description Display Description ...
Страница 100: ...Data 88 Quick reference appendix Quick reference is a digest of the instruction manual ...