V5097A-E INDUSTRIAL GAS VALVES

9

65-0230—07

WARNING

Explosion Hazard And Electrical Shock Hazard.

Can cause explosion, serious injury or death.

1. Turn off gas supply before starting installation.

2. Disconnect power supply for valve actuator before 

beginning installation.

3. Install the valve so the arrow on the valve body 

points in the gas flow direction.

Location

1.

Install the valve in the gas supply line downstream from 

the pressure regulator. 

2.

Mount the valve and actuator in any position that allows 

sufficient clearance for installation and for repair and 

replacement. 

3.

Be sure the valve position indicators are easily visible 

with the valve and actuator in the final position.

4.

Ensure the final position of the valve and actuator allows 

for damper linkage, if used.

IMPORTANT

Allow space for turning the valve body and pipe 

adapter (actuator not attached) onto the gas piping. 

Swing dimensions measured from the center of the 

pipe for 3/4 in. through 2 in. (small) valves are 3-1/4 

in. (83 mm) and for 2 in. through 3 in. (large) valves 

are 5 in. (127 mm).

WARNING

Explosion Hazard.

Can cause serious injury or death.

1. Make sure gas flow is in the direction of the arrow on 

the valve body so the valve shuts off.

2. Do not use valve in a corrosive environment or the 

valve may not shut completely.

IMPORTANT

Use only the three Grade 5 (minimum) bolts or metric 

equivalent with split washers (supplied with valve) 

secured and fastened to ensure gas-tight seal. Use all 

six bolts.

Installation

Installation instructions are found in form 66-1099, Integrated 

Valve Train Assembly Instructions.

OPERATION AND CHECKOUT

Operation

A V5097 Industrial Gas Valve is operated by a V4055, V4062 

or V9055 Fluid Power Gas Valve Actuator. The valve opens 

when the actuator is energized, and closes when power is 

removed. When closed, the valve seals off against the rated 

close-off pressure with no power applied. For further 

information, refer to the actuator instructions.

Checkout

WARNING

Explosion Hazard And Electrical Shock Hazard.

Can cause explosion, serious injury or death.

Do not allow fuel to accumulate in the combustion 

chamber for longer than a few seconds without igniting 

to prevent an explosive mixture from accumulating.

WARNING

Explosion Hazard.

Can cause serious injury or death.

1. Do not put the system into service until you have 

satisfactorily completed the following Valve Leak 

Test, all applicable tests described in the Checkout 

section of the instructions for the flame safeguard 

control, and any other tests required by the burner 

manufacturer.

2. All tests must be performed by a trained, 

experienced flame safeguard control technician.

3. Close all manual fuel shutoff valves as soon as 

trouble occurs.

After the installation is completed, cycle the valve several times 

with the manual fuel shutoff cock closed. Make sure the valve 

and actuator function properly. Also perform the Valve Leak 

Test before putting the valve into service.

Valve Leak Test (Fig. 5)

This is a test for checking the closure tightness of the gas 

safety shutoff valve. It should be performed only by trained 

experienced flame safeguard control technicians during the 

initial startup of the burner system, or whenever the valve or 

valve bonnet is replaced (see Service Information section). It is 

recommended that this test also be included in the scheduled 

inspection and maintenance procedures. For a periodic 

inspection test, follow steps 1, 3, 4, 5, 8, 9, 10, 12, 13, 16, and 

17. 

1.

De-energize the control system to assure no power goes 

to the valve actuator (

C

, Fig. 5).

2.

Close the upstream manual gas cock (

A

).

3.

Make sure the manual test petcock (F) is closed in the 

leak test tap assembly (

D

).

4.

Remove the leak test tap plug and connect the test 

apparatus to the leak tap (

D

).

5.

Close the downstream manual gas cock (

E

).

6.

Open the upstream manual gas cock (

A

).

7.

Run the V5097 Valve to its fully open position (through 

the safety system); then immediately de-energize the 

system to close the V5097 Valve.

8.

Immerse a 1/4 in. (6 mm) tube vertically 1/2 in. (13 mm) 

into a jar of water.

9.

Slowly open the test petcock (

F

).

10.

When the rate of bubbles coming through the water 

stabilizes, count the number of bubbles appearing during 

a ten-second period or note the time required for ten 

bubbles. Each bubble appearing represents a flow rate 

of 0.001 cfh. 

To meet US requirements, be sure leakage does not exceed 

the rates in Table 6.

Содержание V5097A-E

Страница 1: ...uid Power Actuators to provide proof of closure switch and valve seal overtravel interlock V5097D E Valves are for high pressure applications see Table 2 Two valve body types small and large applicable to seven pipe sizes Small body type for 3 4 in 19 mm 1 in 25 mm 1 1 4 in 32 mm 1 1 2 in 38 mm and 2 in 51 mm pipes Large body type for 2 in 51 mm 2 1 2 in 64 mm and 3 in 76 mm pipes Eight pipe adapt...

Страница 2: ...mal manufacturing tolerances therefore an individual unit may not exactly match the specifications listed Also this product is tested and calibrated under closely controlled conditions and some minor differences in performance can be expected if those conditions are changed a Refer to Table 3 or actual pressure ratings of the various combinations of valves and actuators b Valve guide has notches t...

Страница 3: ...dy Valve 8 0 lb 3 64 kg Small Body Pipe Adapters 67 lb 0 3 kg Large Body Pipe Adapters 2 125 lb 97 kg Replacement Parts 133393A Replacement Seal Assembly Includes valve seal bonnet seal and tube of lubricant for Small Body Valves 133392A Replacement Seal Assembly Includes valve seal bonnet seal and tube of lubricant for Large Body Valves For all pipe adapter sizes see Table 4 Replacement Bonnet As...

Страница 4: ...0 86 86 86 8 3 16 8 3 16 8 3 16 8 3 16 8 5 16 8 5 16 8 5 16 208 208 208 208 211 211 211 8 1 4 8 1 4 8 1 4 8 1 4 11 3 4 11 3 4 11 3 4 210 210 210 210 298 298 298 IN MM IN MM IN MM 62 62 62 62 91 91 91 5 5 5 5 8 8 8 127 127 127 127 203 203 203 58 58 58 58 113 113 113 23 23 23 23 38 38 38 100 100 100 100 165 165 165 71 71 71 71 114 114 114 3 4 1 1 1 4 1 1 2 2 2 1 2 3 M11682A ALLOW 2 IN 51 MM CLEARANC...

Страница 5: ...1 2 to 3 13 880 High Pressure Valves V5097D E 3 4 to 2 5 340 40 2700 75 5 25 1 6 62 4 75 5 2 to 3 13 880 45 3 15 1 21 1 4 45 3 6 3 4 171 1 9 32 33 D DIM A DIM B DIM C DIM D DIM E DIM F DIM G DIM H DIM J G E C A H F J OCTAGON OCTAGON 5 127 VALVE SIZE IN IN MM IN MM IN MM IN MM IN MM IN MM IN MM 11 1 8 11 1 8 11 1 8 11 1 8 11 3 4 11 3 4 11 3 4 283 283 283 283 298 298 298 2 3 4 2 3 4 2 3 4 2 3 4 3 3 ...

Страница 6: ...from step 4 for determining the gas valve size in Fig 4 6 Determine the maximum pressure drop across the valve and draw a horizontal line at this pressure in Fig 4 7 Draw a vertical line in Fig 4 at the capacity cfh previously determined Use the corrected capacity for a gas with a specific gravity other than 0 64 8 Use the valve size at the intersection of the horizontal and vertical lines If the ...

Страница 7: ...ed on 0 72 sp gr gas is required What valve capacity based on 0 64 sp gr gas will be required On the vertical scale of Fig 3 find 0 72 specific gravity left side of figure Draw a line horizontally from that point to the right to intersect the curve then move straight down the chart to the bottom scale and read the conversion factor 1 06 in this example Multiply the 2670 cfh by the conversion facto...

Страница 8: ...valve body The retained water is effectively excluded from the valve stem and spring chamber by a functional seal that is incorporated into the NEMA 4 rated actuator When Installing this Product 1 Read these instructions carefully Be sure to carefully fol low Warning information 2 Check the ratings given in the instructions and on the product to make sure the product is suitable for your applicati...

Страница 9: ...ate in the combustion chamber for longer than a few seconds without igniting to prevent an explosive mixture from accumulating WARNING Explosion Hazard Can cause serious injury or death 1 Do not put the system into service until you have satisfactorily completed the following Valve Leak Test all applicable tests described in the Checkout section of the instructions for the flame safeguard control ...

Страница 10: ...uator 1 Turn off the gas supply at the manual shutoff valve located upstream from the valve s being serviced 2 Shut off all electrical power to the valve actuator s 3 Mark and disconnect the wires from the actuator termi nals Remove conduit and disengage the damper link age assembly if applicable 4 Loosen the two set screws from the valve to lift off the actuator 5 If the actuator is to be replace...

Страница 11: ...r mechanical operation CAUTION Be sure to perform a bonnet seal and seat leak check after installation Be sure to read and follow all instructions that come with the actuators valves seal and bonnet kits Valve Bonnet Replacement The entire valve bonnet can be replaced without removing the valve body from the gas line Do not disassemble the valve bonnet assembly because the valve seat is not replac...

Страница 12: ... Honeywell Limited Honeywell Limitée 1985 Douglas Drive North 35 Dynamic Drive Golden Valley MN 55422 Toronto Ontario M1V 4Z9 customer honeywell com V5097A E INDUSTRIAL GAS VALVES U S Registered Trademark 2009 Honeywell International Inc 65 0230 07 M S Rev 08 09 ...

Отзывы: