SPYDER MODEL 5 ENGINEERING TOOL
–
USER GUIDE
85
31-00282ES-01
Clearing Controller
Clear Controller” deletes the application in the controller
.
Procedure
1.
Right-click on IRM Program in the tree, then click
Actions
, and then click
Clear Controller
in the context menu.
RESULT: The application is deleted in the controller. The successful action is displayed via IRM
Operations
Monitor
.
Clearing Project
“Clear Project” deletes the application in the project.