Honeywell
• 27
P
OWER
CABLING
Figure 21.
5
Insert the cables - supply cable, motor cable and optional brake cable - in the
openings of the cable entry plate. Then cut the rubber grommets open to slide
the cables through. Do not cut the grommet openings wider than what is neces-
sary for the cables you are using.
IMPORTANT NOTE FOR NEMA12 INSTALLATION:
To meet the requirements of the enclosure class NEMA12, the connection
between the grommet and the cable must be tight. Therefore, lead the first bit of
the cable out of the grommet straight before letting it bend. If this is not possible,
the tightness of the connection must be ensured with insulation tape or a cable tie.