Installation tasks
The specific tasks you need to perform vary depending upon the type of furniture in which you are
installing the workstation. The following table lists the major platform installation tasks.
Task
For more information refer to…
Be aware of all power and grounding
requirements for your furniture.
Specific site requirements
Section
Verify pinning for external media drives is correct
Section
Install the workstation in the furniture
Section
Installing workstation in Icon
Section
Installing workstation in Z and
Section
Connect device cables
Section
3.2
Power and grounding requirements
The ground connection is made through the third wire in the AC power cord.