Calibration Procedures
2/03
10260A Series Actuators – Installation, Operations, and Maintenance
39
Adjusting R4 will cause actuator movement (for units with a Motor Positioner board) and may be
required to get actuator to 100 % position even if output is in tolerance.
16. Reposition the actuator to the 0 % of span position and take another reading.
17. If the reading is still out of line, repeat steps 12 through 16 until both zero and span readings and
positions are in line.
R4
R3
R2
R1
W10 Jumper
Shown with jumper on Pins 1 and 2
for CCW Rotation
J5
J4
J3
J2
J1
Figure 4-6 0/4-20 mA PWA Output Board
Содержание HercuLine 10260A
Страница 10: ...x 10260A Series Actuators Installation Operations and Maintenance 2 03 ...
Страница 36: ......