Part 2
– Classroom/Virtual Classroom Session
• In this Session you will learn how to:
• Install the Commissioning Tool
• Licence the Commissioning Tool
• Retrieve the Configuration from a Vigilon Panel
• Configure Site Info, Label Devices and Zones
• Change Device Zone Assignments
• Change the Zone Mode
• Transmit the Configuration to the Vigilon Panel
• Back Up the Panel’s Configuration
• Interpret Device Condition/Exception Codes
• Configure Squad Sensors, Sounder VADs/SCubed Wall Mounted Sounder
VADs
• Add/Remove a Device to/from a SOFT or SAFE Addressed Loops
• To Register and Navigate GENTEXPERT
• Interrogate the Panel’s Logs
• Use the VigInSite Tool
• Disable elements of the Panel and use Zone Test Mode
• Assessment
Содержание Gent Compact Plus
Страница 1: ...Vigilon Plus Basic Commissioning Training ...
Страница 4: ...Vigilon Plus 4 6 Loop Panels ...
Страница 16: ...Compact Plus 2 loops ...
Страница 18: ...Main Control Board 0 Loop Card 1 Loop Card 2 Network Card 10 NVM Card 14 Compact Plus Cards Micro SD card ...
Страница 21: ...Your Turn Power Up ...
Страница 24: ...INFO STATUS CARD Card Status Type in a card number in the range of 0 15 ENTER ...
Страница 26: ...Vigilon System Loop Architecture ...
Страница 27: ...Main Loop PRESS HARD TO PRESS HARD TO Vigilon System Loop Architecture L1 End 1 L2 End 2 ...
Страница 30: ...Soft Addressing ...
Страница 36: ...SAFE Addressing ...
Страница 44: ...Analogue Detection ...
Страница 49: ...Digital Outputs and Analogue Channels On Off low tone Hi tone ...
Страница 61: ...Site Information ...
Страница 63: ...Labelling ...
Страница 67: ...Zones ...
Страница 74: ...Condition Code Analysis Subfault Exception BS panel V3 EN54 panel V4 ...
Страница 76: ......
Страница 84: ...S Quad Remote LED Output can be configured to control a remote LED 13449 01 Monitored or un monitored wiring ...
Страница 93: ... Other Panel Functions ...
Страница 105: ...VigInSite ...
Страница 112: ...Loop Diagnostic Tool LDT ...
Страница 117: ...LDT Panel Overview Panel Overview Panel cards and versions Loop overview Click the required View Loop Button ...
Страница 119: ...LDT Earth Fault Earth fault Detected Click to Locate Earth fault The Loop will now reallocate ...
Страница 120: ...LDT Earth Fault ...
Страница 122: ...LDT Reports cont Extracts from an Engineer report ...
Страница 123: ...EN54 Part 23 Overview ...
Страница 126: ...Wall Mounted VADs CEILING MOUNTED C 6 16 16m ...