
Attention
When you click
Save
, the configuration is saved temporarily.
10
Click
OK
.
11
Click
OK
to close the
Field Network Configuration
form.
The field network configuration is saved to the ERDB.
Attention
If you click
Cancel
and close the configuration form, the configuration is not saved to the ERDB even if you have
clicked
Save
on the
Field Network Configuration
tab toolbar.
12
Reload the Protocol Block.
5.6.4 Enabling a secondary PGM to become a primary PGM in the absence of a partner module
You can use the "Become Primary" command to cause an unsynchronized secondary module to transition into
the primary role in the absence of a partner module. This command is applicable only if the unsynchronized
secondary has no view to a partner module across the redundancy cable and the primary IP address is not
occupied.
Tip
You can view the active redundant PGM pair in the Monitoring view.
Perform the following steps to enable a secondary PGM to become a primary PGM in the absence of a partner
module
1
In the Monitoring view, double-click the primary PGM icon.
The PGM block configuration form appears.
2
Click the
Redundancy
tab.
3
Click
Become Primary
.
4
Click
Yes
to confirm the action.
Confirm that the secondary module assumes the primary role. The old primary module should boot up in the
backup role.
5
Click
OK
.
5.6.5 Performing a manual switchover
You can use the "Initiate Switchover" command to manually initiate a switchover to a redundant PGM pair.
Tip
You can view the active redundant PGM pair in the Monitoring view.
Prerequisites
The primary and secondary modules are synchronized.
Perform the following steps to perform a manual switchover
1
In the Monitoring view, double-click the primary PGM icon.
The PGM block configuration form appears.
2
Click the
Redundancy
tab.
3
Click
Initiate Switchover
.
4
Click
Yes
to confirm the action.
Confirm that the secondary module assumes the primary role.
5 PROFIBUS GATEWAY MODULE (PGM) BLOCK
46
www.honeywell.com
Содержание Experion PKS
Страница 1: ...Experion PKS PROFIBUS Gateway Module User s Guide EPDOC XX88 en 431E June 2018 Release 431 ...
Страница 8: ...CONTENTS 8 www honeywell com ...
Страница 10: ...1 ABOUT THIS GUIDE 10 www honeywell com ...
Страница 32: ...4 PROFIBUS GATEWAY MODULE PGM INSTALLATION 32 www honeywell com ...
Страница 58: ...5 PROFIBUS GATEWAY MODULE PGM BLOCK 58 www honeywell com ...
Страница 69: ...6 PROTOCOL BLOCK 69 ...
Страница 103: ...5 Click OK 6 PROTOCOL BLOCK 103 ...
Страница 109: ...You can modify the following value from the Protocol Main tab detail display Alarming Enabled 6 PROTOCOL BLOCK 109 ...
Страница 110: ...6 PROTOCOL BLOCK 110 www honeywell com ...
Страница 181: ...7 20 3 Detail display tab Main tab Figure 4 Detail Display of Main tab 7 DEVICE SUPPORT BLOCK DSB 181 ...
Страница 182: ...Slave Status tab Figure 5 Detail Display of Slave Status tab 7 DEVICE SUPPORT BLOCK DSB 182 www honeywell com ...
Страница 183: ...PDC Details tab Figure 6 Detail Display of PDC Details tab 7 DEVICE SUPPORT BLOCK DSB 183 ...
Страница 184: ...DPV1 Details tab Figure 7 Detail Display of DPV1 Details tab 7 DEVICE SUPPORT BLOCK DSB 184 www honeywell com ...
Страница 185: ...Config Details tab Figure 8 Detail Display of Config Details tab 7 DEVICE SUPPORT BLOCK DSB 185 ...
Страница 186: ...7 DEVICE SUPPORT BLOCK DSB 186 www honeywell com ...
Страница 229: ...For a digital channel the detail display appears as follows 9 PROFIBUS I O MODULE PIOMB FUNCTION BLOCK 229 ...
Страница 231: ...9 PROFIBUS I O MODULE PIOMB FUNCTION BLOCK 231 ...
Страница 232: ...9 PROFIBUS I O MODULE PIOMB FUNCTION BLOCK 232 www honeywell com ...
Страница 236: ...10 PROFIBUS GATEWAY MODULE PGM CONFIGURATION EXAMPLE 236 www honeywell com ...
Страница 264: ...13 PROFIBUS GATEWAY MODULE PGM TROUBLESHOOTING 264 www honeywell com ...