A point in time connection can be manually initiated at any time (e.g. for a test). To do so, change the
parameter "
TestC
" to 1 ("open"). The EK280 opens the interface and attempts to reach the target. In order to
follow the progress of the point in time connection, observe the "
StCon
" parameter and "
SDst 1, 2
".
Use the enSuite button "
Refresh
”
at the menu bar of enSuite, to get the actual information in the enSuite.
If the conditions for regular activation of the point in time connection are met, then the interface is opened
and the EK280 attempts to reach the target.
Conditions for regular activation of the point in time connection are as follows:
−
Has the device time currently exceeded the parameterized point in time?
−
Does the supply to the EK280 correspond with the parametrization of the connection?
−
Is there a valid telephone number or IP address and the port of the recipient parameterized within
the associated telephone book entry?
7.6.3 Connection configuration status "StCon"
Display Description
0
Establishment of a connection has not yet started.
2
The interface is activated specifically for the connection.
3
The interface to be used for the connection (i.e. the modem) is busy, the EK280 will wait until
connection can be established.
Either the interface has just been used for another connection or the EK280 is waiting to try
again after a failed connection attempt.
This state may persist for several minutes.
4
The interface (i.e. the modem) is ready to establish a connection (i.e. the call time window is
open).
5
The interface is released specifically for the connection.
6
The interface (i.e. the modem) is released from other connections for use. (i.e. when the time
window is no longer open)
7
Data transfer via DLMS protocol is in progress.
8
Data transfer via DLMS protocol is complete.
9
Data transfer via Modbus protocol is in progress.
10
Data transfer via Modbus protocol is complete.
11
Data transfer via LIS200 protocol is in progress.
12
Data transfer via LIS200 protocol is complete.
13
The EK280 is synchronizing with the EIServer, in readiness to begin data transfer via DLMS
protocol.
14
EIServer synchronization is complete.
Содержание Elster EK280
Страница 1: ...73022106 as of 2018 1 From firmware 2 51 Volume Converter EK280 Manual Application ...
Страница 2: ......