
n
Equipment shall be installed in compliance with the enclosure,
mounting, spacing and segregation requirements of the ultimate
application.
n
For installation with a second active phase (L-L) instead of neutral
(L-N) connection both phases must be protected externally with
circuit breaker adequately rated for 3 A maximum and 250 V AC
minimum.
For Canada
n
The installer shall provide transient over-voltage protection
external to the apparatus such that the voltage at the supply
terminal of the apparatus does not exceed 140% of the voltage
rating of the equipment.
n
The equipment shall be mounted in an enclosure providing a
minimum degree of protection of IP54 in accordance with
CAN/CSA 60529., and in a tool-secured enclosure which meets the
requirements of CAN/CSA 60079-0 and CAN/CSA 60079-15.
n
Equipment shall be installed in compliance with the enclosure,
mounting, spacing and segregation requirements of the ultimate
application.
For ATEX
n
The installer shall provide transient over-voltage protection
external to the apparatus such that the voltage at the supply
terminal of the apparatus does not exceed 140% of the voltage
rating of the equipment.
n
The equipment shall be mounted in an enclosure providing a
minimum degree of protection of IP54 in accordance with
EN/IEC 60079-15.
n
The equipment shall be mounted in a tool-secured enclosure
which meets the requirements of EN/IEC 60079-0 and EN/IEC
60079-15.
n
The equipment shall be used in an area not more than Pollution
Degree 2 as defined in EN/IEC 60664-1.
180
Chapter 9 - Special Condition of Use and Approved Standards
Содержание ControlEdge 900 platform
Страница 6: ...6 Contents ...
Страница 12: ...12 Chapter 1 About this guide ...
Страница 52: ...52 ...
Страница 57: ...57 One Slot Rack 1 CPM 1 EPM 1 P S 1 RM ...
Страница 59: ...59 One Slot Rack ...
Страница 62: ...Figure 5 7 Rack dimensions with redundant power supply 62 ...
Страница 75: ...75 c Insert the Ethernet cables and mount the security cover for the EMP ...
Страница 76: ...d Optional mount a wire security seal The user should get a wire security seal themselves 76 ...
Страница 124: ...Figure 5 31 Universal Analog Input Wiring Figure 5 32 Examples of RTD Input Wiring 124 ...
Страница 125: ...125 Figure 5 33 Analog Input Wiring Eight TCs Figure 5 34 Analog Input Wiring Eight Resistance Inputs ...
Страница 136: ...Settings using input 1 as example Single ended factory setting Differential Figure 5 46 Pulse Counting Wiring 136 ...
Страница 137: ...137 Figure 5 47 Pulse Outing Wiring Figure 5 48 Frequency Wiring ...
Страница 138: ...Figure 5 49 Quadrature Differential External Power Wiring Figure 5 50 Quadrature Single Ended External Power Wiring 138 ...
Страница 144: ...Figure 5 57 16 point High Level Analog Input Wiring 144 ...
Страница 147: ...147 Figure 5 60 AC DC Isolated Input Module Wiring ...
Страница 148: ...148 ...
Страница 168: ...168 ...
Страница 178: ...178 Chapter 8 Diagnostics and Troubleshooting ...
Страница 221: ...Appendix A Installing RTP RTP Internal schematic Applies to UAI Figure A 13 Analog Input RTP Internal schematic 221 ...
Страница 222: ...Appendix A Installing RTP 222 ...
Страница 227: ...Appendix A Installing RTP Relay Output RTP Internal schematic 227 ...