
CGW-MB Installation and Users’ Manual | P/N:LS10248-000HW-E | REV.G | JUL/31/2022
19
CGW-MB Parts
Overview
2.3.3 Switches on the CLSS Gateway mainboard Board
Below table informs about the switches on the CLSS Gateway mainboard board. To locate
the switches on the CLSS Gateway mainboard board, refer to
.
Table 2.3: CLSS Gateway mainboard Board Switches
2.4 CGW-MB Parts
Switches
Purpose
S6
For securely configuring the CLSS Gateway mainboard’s settings
Pressing the switch for six seconds switches the CLSS Gateway
mainboard board to the configuration mode.
S7
For changing the direction of the 24V power of the NUP/RS-232
connector
NUP_IN: The CLSS Gateway mainboard board receives power through
its NUP/RS-232 port.
NUP_OUT: The CLSS Gateway mainboard board receives power through
its power supply port, which is connected to an external power supply
source.
S8
For enabling mobile pairing
Pressing the switch for ten seconds enables mobile pairing.
Part Number
Description
HON-CGW-MBB
CGW-MB with enclosure
CGW-MB
CGW-MB board
CGW-BB
CGW-MB enclosure
50160636-001
CGW-MB kit. It includes a 30” NUP cable
and a NOTIFIER lock and key set.
32351718-001
10 ft NUP Serial (RS-232) cable kit