Program
A
Program
B
START
Valve proving system
Program B
Valve V2 opens for the set opening time t
L
. V2 closes
again. During the measurement time t
M
, the tightness
control checks the pressure p
Z
between the valves.
If pressure p
Z
> p
u
/2, valve V1 is leaking.
If pressure p
Z
< p
u
/2, valve V1 is tight. Valve V1 is
opened for the set opening time t
L
. V1 closes again.
During the measurement time t
M
, the tightness control
checks the pressure p
Z
between the valves.
If pressure p
Z
< p
u
/2, valve V2 is leaking.
If pressure p
Z
> p
u
/2, valve V2 is tight.
The tightness test can only be performed if pressure p
d
downstream of V2 is around atmospheric pressure and
the volume downstream of V2 is at least 5 × higher than