p/n 6510020208
10/4/07
2-1
2. Site Preparation
To provide the proper environment for installation of the Precision
Platform, use the information in this chapter before the Precision Platform
equipment arrives on site.
Site preparation activities include:
•
Obtaining the latest scanner installation drawings
•
Choosing a scanner location
•
Allocating space
•
Building mounting pedestals
•
Obtaining lifting equipment
•
Installing cables, conduits, and cable trays
•
Providing a safety ground
•
Providing AC power, including power quality and DC power
supplies
•
Providing communications network
•
Connecting field wiring
•
Providing low-pressure purge air (if required), including
blowers and motors and solutions for condensation problems
•
Providing high-pressure instrument air
Содержание 4022
Страница 1: ...Precision Platform 4022 Scanner System Manual 6510020208 ...
Страница 2: ......
Страница 3: ...Precision Platform 4022 Scanner October 2007 ...
Страница 22: ......
Страница 72: ......
Страница 94: ......
Страница 126: ......
Страница 162: ......
Страница 170: ......
Страница 221: ...Scanner Maintenance Heads and sensors Figure 9 10 High Pressure Air Manifold p n 6510020208 10 18 07 9 45 ...
Страница 234: ......
Страница 239: ...Glossary p n 6510020208 10 18 07 11 5 VIO Virtual Input Output ...