![HOLZMANN MASCHINEN MF5IN1 Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/holzmann-maschinen/mf5in1/mf5in1_user-manual_2147522017.webp)
OPERATION
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
17
MF5IN1
12
OPERATION
12.1
Workbench
Release all legs from their locking position, rotate each pair of legs and fix them
Push the fixing knob and pull the inner legs out to endposition
Insert MDF board (if needed)
Don’t use scaffold mode with legs fully extended!
12.2
Scaffold
Release all legs from their locking position, rotate each pair of legs and fix them
(see workbench)
Содержание MF5IN1
Страница 6: ...TECHNIK HOLZMANN MASCHINEN GmbH www holzmann maschinen at 6 MF5IN1 Arbeitsbühne Rollbrett ...
Страница 7: ...TECHNIK HOLZMANN MASCHINEN GmbH www holzmann maschinen at 7 MF5IN1 Handkarren Transportwagen ...
Страница 14: ...TECHNIC HOLZMANN MASCHINEN GmbH www holzmann maschinen at 14 MF5IN1 Scaffold Creeper ...
Страница 15: ...TECHNIC HOLZMANN MASCHINEN GmbH www holzmann maschinen at 15 MF5IN1 Handtruck Dolly ...
Страница 19: ...ELEKTRICAL SUPPLY HOLZMANN MASCHINEN GmbH www holzmann maschinen at 19 MF5IN1 12 5 Dolly 13 ELEKTRICAL SUPPLY ...
Страница 24: ......