ASSEMBLY
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
29
FS160SOLID
ASSEMBLY
14.1
Checking Scope of Supply
Check the machine immediately after delivery for transport damage and missing parts.
14.2
The workplace
Choose a suitable place for the machine.
Pay attention to the safety requirements and the dimensions of the machine.
The selected location must ensure a suitable connection to the electrical supply as well as the
possibility of connection to an extraction system. Make sure that the floor can support the load of
the machine. The machine must be levelled simultaneously at all support points. It is also
necessary to guarantee a distance of at least 0.8 m around the machine. In front of and behind
the machine, the necessary distance must be provided for the feeding of long workpieces.
Always work in front of the machine from right to left.
14.3
Assembling the machine
The machine is pre-assembled, the parts removed for transport must be assembled according to
the following instructions and the connection to mains have to be made.
1.
Assembly Cover
There are four screws (3) on the
top of the protective hood (2).
Remove the screws (3) and attach
the hinged top cover (1) as
shown.
2.
Assembly Protective hood
Assemble the protective hood (2)
to the machine table using the
two screws (1). The protective
hood (2) can be fixed here at
different positions adapted to the
workpiece to be machined.
Содержание FS160SOLID
Страница 43: ...ERSATZTEILE SPARE PARTS HOLZMANN MASCHINEN GmbH www holzmann maschinen at 43 FS160SOLID...
Страница 44: ...ERSATZTEILE SPARE PARTS HOLZMANN MASCHINEN GmbH www holzmann maschinen at 44 FS160SOLID...
Страница 48: ...PRODUKTBEOBACHTUNG PRODUCT MONITORING HOLZMANN MASCHINEN GmbH www holzmann maschinen at 49 FS160SOLID...