Holzhof MAX XM 202 RA Скачать руководство пользователя страница 1

 

MAX XM 202 RA line 

assembly 
instructions 

Содержание MAX XM 202 RA

Страница 1: ...MAX XM 202 RA line assembly instructions...

Страница 2: ...ASSEMBLY SEQUENCE 1 STRUTS AND PLATFORMS 5 TUBE SLIDE 9 SWING 2 ARCHWAYS 6 PARAPET 10 ROOF 3 CLIMBING BOARD 7 STEPS PANEL 11 UNDERGROUND LAYING ANCHORAGE 4 CURVED SLIDE 8 BENCH OF THE STRUCTURE...

Страница 3: ...washer 5 2 _ UNI7473 M8 self locking nut 7 2 UNI4017 M8X155 HEX SCREW NOTA BENE it is recommended to fix the bolts definitively and only insert the caps once the correct positioning of the elements ha...

Страница 4: ...een verified 1 Position the archway between the struts and fix it by inserting 1 x M8 washer 3 1 x M8x260 TORX screw 2 1 x 25 mm winged PE cap 1 into the upper part 1 x PE nut protection cap 4 1 x M8...

Страница 5: ...board 2 Attach the climbing board 6 by introducing the threaded bars 5 into the pre drilled holes in the platform frame these were previously fixed by inserting the PE nut protection cap 4 M8 washer...

Страница 6: ...slide 3 2 Check correct positioning verticality and parallelism Fix the bolts definitively and position the caps 3 Repeat the operation also on the other side of the slide NOTE COLOURS AND MODELS REPR...

Страница 7: ...ping the entry to the tube in correspondence with the height of the platform 2 Fix using the relevant bolts as indicated in the figure The following instructions are also valid for the tube bridge NOT...

Страница 8: ...ng of the elements has been verified 1 Position the PE parapet between the struts resting the two lower fixing wings on the platform and then fix using 4 x M8 washer 3 4 x M8x80 TEL screw 2 WOOD 4 x M...

Страница 9: ...he elements has been verified 1 Fix the steps panel 1 under the tower platform measuring 144 cm using the bolts indicated in the figure 1 1 x steps panel 2 4 x PE cap 3 4 x M8x80 TEL screw LG 4 4 x M6...

Страница 10: ...asher 4x 4 M8x130 TEL screw 4x LG 5 M6 3x60 TEFR screw 4x AL 6 Assembled bench NOTA BENE it is recommended to fix the bolts definitively and only insert the caps once the correct positioning of the el...

Страница 11: ...the structure strut 1 Fix the struts to the beam 4 Fix the flower shaped gable board in PE 3 Fix the swing which can be the plank cage or palm type NOTA BENE it is recommended to fix the bolts defini...

Страница 12: ...0X110 CUP SQUARE SCREW 3 12 XPE116 PE CAP 4 12 _ 10 WASHER 5 4 XPE11 SHAPED PE NUT PROTECTION CAP 6 8 XPE10 PE CAP 7 8 M10 SELF LOCKING NUT 1 Attach the struts to the beam using the relevant bolts as...

Страница 13: ...nto the swing hangers as indicated in the figure NOTE colours and models represented are purely indicative The following instructions can also be applied to swings with iron beams Article num Quantity...

Страница 14: ...AP 5 2 XPE174 ROTATIONALLY MOULDED GABLE BOARD IN PE Wooden struts Aluminium struts M8x80 TEL SCREW M6 3x60 SELF TAPPING SCREW 1 Fix the gable board 5 to the struts using the relevant bolts as indicat...

Страница 15: ...op of the struts with the brackets positioned as in figure A 2 Insert the bolts necessary for fixing in sequence as indicated in figure B 3 Repeat the operation on all 4 struts BOLT POSITION Article n...

Страница 16: ...Concrete deck rubber safety flooring...

Страница 17: ...ert the caps once the correct positioning of the elements has been verified 3 When the concrete has set position the climbing board brackets in the hole checking the correct alignment of the lower par...

Страница 18: ...1 Excavate a hole with diameter of 30 cm and depth of 60 cm 2 Cast a first layer of concrete with thickness of 10 cm...

Страница 19: ...3 When the concrete has set position the slide bracket in the hole checking the correct alignment of the lower part of the slide with the finished ground level...

Страница 20: ...4 Complete concrete casting as per layout 5 When the concrete has set fill the excavation hole by compacting the infill material up to the finished ground level...

Страница 21: ...1 Excavate two holes with diameter of 30 cm and depth of 60 cm as per layout 2 Cast a first layer of concrete with thickness of 10 cm...

Страница 22: ...The measurements vary on the basis of the entrance to the slide from a minimum of 20 to a maximum of 35 cm...

Страница 23: ...3 Complete concrete casting as per layout 4 When the concrete has set fill the hole by compacting the infill material up to the finished ground level...

Страница 24: ...e for dimensions 5 cm concrete slab 2 Complete concrete casting as per layout 3 When the concrete has set fill the hole by compacting the infill material up to the finished ground level height from th...

Страница 25: ...Sand Bark mulch Fine gravel 30 cm BRACKET 100 cm...

Страница 26: ...rubber safety flooring 4 5 cm concrete slab 7 5 cm land scarification BRACKET 75 cm...

Страница 27: ...e hole thoroughly using an air pump and small brushes 3 Insert the anchor into the hole present on the bracket with the aid of a hammer 4 Tighten using dynamometric wrench 4x M10x90 screw anchors rubb...

Страница 28: ...sing the relevant bolts as indicated in the figure Article num Quantity CODE N NAME 1 2 xpe10 PE nut protection cap 2 2 xpe116 PE cap 3 1 PE climbing board 4 2 xfe265 59x59x35 stainless steel angle br...

Страница 29: ...ion of the screw anchor 2 Drill the support surface and position the screw anchor 3 Fix the angle bracket to the support surface using the relevant bolts as indicated in the figure Article num Quantit...

Страница 30: ...he support surface and position the screw anchors 4 Fix the bracket to the support surface using the relevant bolts as indicated in the figure Article num Quantity NAME 1 2 Tube slide anchorage bracke...

Страница 31: ...2 Clean the hole thoroughly using an air pump and small brushes 3 Insert the anchor into the hole present on the bracket with the aid of a hammer 4 Tighten using dynamometric wrench 4 x M10x90 screw...