20
V125T/July 2020/V1.1
4.2
Prior to use
Please make sure that the contacting surface for the magnet is level, clean and rust-free.
Remove any varnish or primer. When working on materials that are not magnetizable, suitable
fixation devices are obtainable as accessories from HMT, e. g. suction plate, vacuum plate or
pipe-drilling clamp must be used.
When working on steel materials with a material thickness of less than 5 mm, the work piece must
be reinforced with an additional steel plate in order to guarantee the magnetic holding power.
Check the machine for possible damage before using the machine, you must carefully check
protective devices or slightly damaged components to ensure they are operating perfectly and as
intended.
Check that moving are in perfect working order and do not jam and check whether parts are
damaged. All parts must be correctly installed and fulfill all conditions necessary to ensure perfect
operation of the machine.
Damaged protective devices and parts must be repaired or replaced according to specifications by
HMT of any authorized HMT dealer.
DO NOT
use under wet conditions or in presence of flammable liquids or gases.
This magnetic drilling machine is a professional power tool.
DO NOT
let children near the machine.
Supervision is required when inexperienced operators use this machine.
ELECTRICAL SAFETY
The electric motor has been designed for one voltage only.
Always check that the power supply corresponds to the voltage on the rating plate.
Your HMT MAGNETIC DRILLING MACHINE is designed in class I (grounded) according to
BS EN 62841-1. Earthing connection is required.
If the supply cord is damaged, it must be replaced by a specially prepared cord available through the
HMT service organization.
EXTENSION CABLE
If an extension cable is required, use an approved 3-core earthed extension cable suitable for the
power input of this tool (see technical data). Minimum conductor size is 1.5 mm²; the maximum
length is 30 metre. When using a cable reel, always unwind the cable completely.
TRY A FEW SIMPLE PROJECTS USING SCRAP MATERIAL UNTIL YOU DEVELOP A “FEEL” FOR THE
MACHINE
LET THE MACHINE RUN IN FOR A PERIOD OF 8-10 HOURS BEFORE STARTING WITH BIG OPERATIONS.
DO NOT LOAD THE MACHINE TOO MUCH DURING RUN-IN PERIOD
NEVER USE THE MACHINE IN SERIOUS OVERLOAD
KEEP THE MACHINE CLEAR FROM MOISTURE AT ALL TIMES TO PROTECT THE MACHINE, YOURSELF
AND OTHERS.