Section 5:
Scheduled Maintenance
5.1 Scheduled Maintenance Introduction
Most components of the waterblasting system re-
quire specific maintenance at scheduled intervals
recommended by the component manufacturer
or Hog Technologies. Maintenance schedules and
service procedures for the primary components
of the waterblasting system are covered in this
section.
The information on components manufactured and
supplied by other manufacturers outlined in this
section is a general overview of the maintenance
recommended and steps required. Always refer to
the component manufacturer’s manuals for more
detailed information and additional maintenance
information.
The Maintenance Matrix at the end this section
identifies the recommended service and/or lu
-
brication intervals for each primary component
of the SH8000 Waterblasting system. You should
become familiar with the maintenance and lubri-
cation requirements of all components. Some of
the lubrication points on components such as the
blower, ultra high pressure pumps and thru-shaft
motor bearings require specialized lubricants. The
use of any lubricant other than the lubricant speci-
fied will void the warranty on those components.
The maintenance intervals outlined in this section
are considered typical for units used in normal
operating conditions. Units used in extremely dirty
conditions, high temperatures or other severe duty
applications will require more frequent service.
CAUTION
THE SCHEDuLED MAINTENANCE PROCEDuRES IN
THIS SECTION MuST BE FOLLOWED EXACTLY TO
AvOID DAMAGING COMPONENTS AND/OR vOIDING THE
WARRANTY.
5.2 Periodic Maintenance Items
The primary components in the waterblasting sys-
tem have specific stated service intervals. Other
components that support primary equipment re-
quire periodic inspection and routine maintenance.
Many of those items are mentioned in this section.
Ladders and Inspection Platforms
Monthly/200 Hours:
• Lubricate and inspect all hinges.
• Inspect and lubricate safety pins and latches.
Replace damaged or worn out safety pins or
spring loaded safety latches immediately if the
spring becomes weak or damaged.
Access Door Hinges And Latches.
Monthly/200 Hours:
• Lubricate and inspect all hinges.
• Inspect and lubricate latches. Replace dam
-
aged or worn out latches immediately.
Safety Pins
Weekly/50 Hours:
•
Lubricate the retaining ball or sliding shaft on
safety pins.
•
Inspect and test for proper operation. Replace
damaged, corroded or worn out pins imme-
diately.
Ball Valves
Monthly/200 Hours:
•
Open and close ball valves at least once each
month to keep them free and operating prop-
erly.
•
Lubricate and inspect valve shafts and handles.
Replace if badly corroded.
Содержание Stripe Hog SH8000
Страница 1: ...Operations Manual...
Страница 2: ...2...
Страница 6: ...6 NOTES...
Страница 16: ...16 NOTES...
Страница 80: ...80 NOTES...
Страница 166: ...166 NOTES...
Страница 171: ...171 Troubleshooting UHP POWER FRAME...
Страница 172: ...172 Troubleshooting...
Страница 173: ...173 Appendix 2 Tools Spare Parts...
Страница 174: ...174 Tools Spare Parts...
Страница 175: ...175 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Страница 176: ...176 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 61...
Страница 178: ...178 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 63 Spray Bar Configuration Charts...
Страница 179: ...179 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 64...
Страница 180: ...180 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 65...
Страница 181: ...181 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 66...
Страница 183: ...183 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 68 Nozzle Calculation Sheet...
Страница 184: ...184 NOTES...
Страница 191: ......