INSTALLATION INSTRUCTIONS
TRU-FIT
DOOR & PANEL
STEP 2
Take the Wall Jamb (A) and line the center of it (indicated by die line) up with
the center line of tub base found in Step 1. The post should be sitting on the
tub or shower base. (See Figure 2)
STEP 3
Make sure that the Wall Jamb (A) is level before marking for holes.
(See Figure 3)
FIGURE 2
FIGURE 3
STEP 1
Determine center line of your shower base by measuring the thickness of the
base and use a pencil to mark the center. Draw this line the entire length of the
base. (See Figure 1)
FIGURE 1
STEP 4
Once the Wall Jamb (A) is level, use a pencil to mark the holes for drilling.
Depending on the support behind the wall, Plastic Anchors (E) may or may
not be required. IF you are unsure, if unsure, use the Plastic Anchors (E) to be
safe. If using an anchor, use 1/4” drill bits to drill holes on the specified marks.
If wooden support is present and no anchor is required, use 3/16” drill bits to
drill holes on specified marks. (See Figure 4)
NOTE: You may need several drill bits when drilling through certain types of
tile or marble. Keep your drill bit cool by spraying with water throughout the
drilling process.
FIGURE 4
V5_21_26
Figure 1
Figure 2
Figure 1
Figure 2