HKC APL-7 Series Скачать руководство пользователя страница 1

APL-7 Series Limit Switch Box   

Installation Operation & Maintenance Manual 

 

Doc No. : HumG-APL7-21 Rev0                     

Page    1 / 10 

Valve Automation Leader, HKC 

 
 

APL-7 Series Valve Position Monitor 

 

Installation, Operation & Maintenance Manual 

 

 
 
 
 
 
 

 

 
 
 
 
 
 

Address : 26, Emtibeui 28-ro, Siheung-si, Gyeonggi-do, 15119, Republic of Korea 
Tel : +82-31-488-8266, Fax : +82-31-488-8269, Home page : 

www.hkcon.co.kr

, email : [email protected] 

 

 

Содержание APL-7 Series

Страница 1: ...L7 21 Rev0 Page 1 10 Valve Automation Leader HKC APL 7 Series Valve Position Monitor Installation Operation Maintenance Manual Address 26 Emtibeui 28 ro Siheung si Gyeonggi do 15119 Republic of Korea Tel 82 31 488 8266 Fax 82 31 488 8269 Home page www hkcon co kr email hkcon hkcon co kr ...

Страница 2: ...dering Information 3 3 Standard specification 3 4 Preparing for installation 4 5 Standard Features 5 6 Installation 5 6 1 Mounting bracket 5 6 2 Mounting limit switch box 6 6 3 Cam setting 6 6 4 Wiring 7 6 5 Setting Position Transmitter Unit APL 7 6 8 7 Maintenance 9 8 Inspection 9 9 Storage 10 10 Trouble Shooting 10 11 Tools 10 12 Installation and Maintenance Tips 10 ...

Страница 3: ...nal Unit 4 20mA Wonwoo SZM V16 5FA 61 or Zippy VA2 16 20 r0 Proximity switch Ambient temperature 20 C to 60 C 20 Proximity Sensor P F NJ2 V3 N 21 Proximity Sensor Autonics PS17 5DNU 22 Proximity Sensor P F NJ4 12GM N 23 Proximity Sensor P F NBB2 V3 25 Proximity Sensor P F NJ2 V3 N Potentiometer 26 Proximity Sensor P F NJ2 V3 N Signal Unit 4 20mA Reed switch Ambient temperature 20 C to 60 C 30 Reed...

Страница 4: ...be certified as flameproof it used in Zone 1 application Cable glands and shall be installed minimum 6 full threads and the length of thread is minimum 8mm The temperature at cable entry and blanching point may exceed 70 and 80 respectively therefore select the appropriate cable gland and min 2SQ of wire is recommended when you install For cable entries or conduit entries that are not used user or...

Страница 5: ...el G4303 SUS303 6 Cam 2 PC 7 Switch 2 Refer to the clause 2 Ordering Information Switch type 8 Body 1 Aluminium die casting ADC12 9 Terminal Strip 1 8P 9 14P available 10 Earth Lug 2 Stainless steel 11 Solenoid Valve 1 Built in 12 Blanking Element 3 Sticker If required by customer optionally used Exp type plug 19r0 6 Installation 6 1 Mounting bracket Caution Where limit switch box or one of parts ...

Страница 6: ...e Basically cams shall be set by manufacturer before shipment 6 3 1 The color of cams harmonized with position indicator help us to set the cams easily without wiring diagram Cams shall be easily set without tool APL series cams are splined and can be setting lift up or push down the cam from gear by hand in a seconds without setting tools Self locking spring loading make never slip out of adjustm...

Страница 7: ...correspond to switch contacts such as normally open NO normally closed NC etc Follow the wiring diagram and electrical code to connect the switches to your system 6 4 3 Solenoid valve may also be able to be wired through the APL enclosure Two auxiliary terminals are included as standard 6 4 4 APL 7 limit switch box has three cable entries on the body User or installer must apply wiring through the...

Страница 8: ...mended Wire square for the external grounding shall be recommended min 4SQ recommended 6 5 Setting Position Transmitter Unit APL 7 6 6 5 1 Potentiometer reads the current position of actuator and transfers a resistance value to a current position transmitter card Transmitter indicates the actuator position throughout the stroke a 4 20mA output signal 6 5 2 Technical features Power Supply Range 12 ...

Страница 9: ...on But when conditions are more severe more frequent inspections may be required 7 1 1 Ensure valve actuator alignment If the alignment among the valve actuator and this limit switch box are not correct it can be a cause of damage on shaft due to metallic fatigue during operating 20 r1 7 1 2 Ensure wiring is insulated connected and terminated properly 7 1 3 Ensure all screws are present and tight ...

Страница 10: ...by qualified and trained personnel When working in potentially explosive areas observe the standard EN 60079 14 Electrical Installations in Hazardous Areas Work at the open actuator under voltage must only be performed if it is assured that for the duration of the work there is no danger of explosion Observe additional national regulations 12 1 Check the limit switch box visually Ensure that no ou...

Отзывы: