HKC APL-2 Series Скачать руководство пользователя страница 1

APL-3 Series Limit Switch Box   

Installation Operation & Maintenance Manual 

 

Doc No. : HumG-APL3-21 Rev1                     

Page    1 / 10 

Valve Automation Leader, HKC 

 
 
 

APL-3 Series Valve Position Monitor 

 
 
 

Installation, Operation & Maintenance Manual 

 

 
 
 

 

 
 
 
 
 

Address : 26, Emtibeui 28-ro, Siheung-si, Gyeonggi-do, 15119, Republic of Korea   
Tel : +82-31-488-8266, Home page : 

www.hkcon.co.kr

, email : [email protected] 

Содержание APL-2 Series

Страница 1: ...No HumG APL3 21 Rev1 Page 1 10 Valve Automation Leader HKC APL 3 Series Valve Position Monitor Installation Operation Maintenance Manual Address 26 Emtibeui 28 ro Siheung si Gyeonggi do 15119 Republic of Korea Tel 82 31 488 8266 Home page www hkcon co kr email hkcon hkcon co kr ...

Страница 2: ...ormation 3 3 Standard specification 3 4 Certification 3 5 Marking 3 6 Standard Features 4 7 Initial Inspection 4 8 Installation 5 8 1 Mounting bracket 5 8 2 Mounting limit switch box 5 8 3 Setting cam 5 8 4 Wiring 6 8 5 Setting Position Transmitter Unit APL 3x6 8 9 Maintenance 9 10 Inspection 9 11 Storage 9 12 Trouble Shooting 9 13 Tools 9 14 Installation and Maintenance Tips 9 ...

Страница 3: ...or VA2 16 20 Proximity Sensor P F NJ2 V3 N 21 Proximity Sensor Autonics PS17 5DNU 22 Proximity Sensor P F NJ4 12GM N 25 C 60 C 18 r0 23 Proximity Sensor P F NBB2 V3 30 Reed type Proximity Sensor Enclosure Material N Aluminum Die casting 3 Standard specification Model APL 3 N Enclosure Rated Weatherproof IP67 Enclosure High grade aluminum alloy Ambient Temperature 20 80 21 r1 Cable Entries Standard...

Страница 4: ...1 Aluminum die casting 9 Terminal Strip 1 8P 9 14P available 21 r0 10 Earth Lug 1 Stainless steel 11 Blanking Element 2 Sticker 7 Initial Inspection 7 1 When the user take over the products please check the condition of the products and compares the contents of the order sheet with the name plate to check for any abnormality 7 2 Carefully remove the packaging wrap or crate and inspect for physical...

Страница 5: ...e 4mm slot in NAMUR actuators Check to be sure the drive slot on the top of the actuator and the shaft of switch box are the same direction Insert the shaft of switch box carefully into the mounting bracket Tighten the bolts enclosed in a box using a proper tool Check the connection of shaft being assembled correctly 8 3 Setting cam Note Basically cams shall be set by manufacturer before shipment ...

Страница 6: ...m located inside the cover indicates which terminal numbers correspond to switch contacts such as normally open NO normally closed NC etc Follow the wiring diagram and electrical code to connect the switches to your system 8 4 3 The APL 3 limit switch box has two cable entries on the body and is protected with a sticker to protect it from moisture and foreign matter penetration User or installer s...

Страница 7: ...mit Switch Box Installation Operation Maintenance Manual Doc No HumG APL3 21 Rev1 Page 7 10 Valve Automation Leader HKC Mechanical Switch 4 SPDT Mechanical Switch 2 DPDT Mechanical switch 2 SPDT include Potentiometer ...

Страница 8: ... 12 5 37VDC 25V typical Current Signal Output 4 20mA Max Load Resistance Max Resistance ohm Supply voltage 12 5 0 02 Potentiometer 0 500 ohm 10k ohm Operation Temperature 20 60 Dimension 40 60 15 8 5 3 Calibrating potentiometer Apply power or air to the actuator to operate fully closed position Connect an ohm meter to P1 and P3 resistance the value shall be approximately 1kΩ Loosen the shaft gear ...

Страница 9: ... care Gap surface must not be damaged or dirtied in any way 10 Inspection 10 1 Check the item and quantity of products with packing list or related documents 10 2 Check the limit switch box o ring Where a damage on it It caused the corrosion of internal parts 10 3 Check the adjustment of cams Cams shall be released when those have been used for a long period of operating If do so they don t work c...

Страница 10: ... of possible discolorations of the terminals and wires 14 6 Check the enclosure gaps whether contaminated dirt and corrosion Since the dimensions of all enclosure gaps are strictly defined and inspected no mechanical work shall be performed on them 14 7 Ensure that all housing covers are handled carefully and that the seals are checked 14 8 All cables have to be checked 14 9 If defects which affec...

Отзывы: