background image

HITROL CO., LTD.

HEAD OFFICE. FACTORY. R&D INSTITUDE
62-182,BONGILCHEON-RI,CHORI-EUP
PAJU CITY, GYEONGGI-DO,KOREA

PAJU CITY, GYEONGGI DO,KOREA
TEL : (00)-82-31-943-0875
FAX : (00)-82-31-943-0878

Technical & Installation Manual

Capacitance Type Level Switch

HCC-95P series 

HPC 95P series

HPC-95P series

1

HCC-95P series_M_E

HITROL CO., LTD.                       

Содержание HCC-95P Series

Страница 1: ...ILCHEON RI CHORI EUP PAJU CITY GYEONGGI DO KOREA PAJU CITY GYEONGGI DO KOREA TEL 00 82 31 943 0875 FAX 00 82 31 943 0878 Technical Installation Manual Capacitance Type Level Switch HCC 95P series HPC 95P series HPC 95P series 1 HCC 95P series_M_E HITROL CO LTD ...

Страница 2: ...ck products 7 2 Cautions on separation 8 Cautions on moving assembly 11 Instructions for user education 12 Trouble checks 13 Outside view of the product 8 Cautions on moving assembly and installation 8 1 Cautions on installation 8 2 Cautions on moving and separation 13 Outside view of the product 14 Limited warranty and contact information 14 1 Limited warranty and service 14 2 C i f i 8 3 Caution...

Страница 3: ...low viscous liquid and highly corrosive liquid Its operation status can be checked on the spot Installation and operation is very easy It can set delay time of Relay contact output There re various Probes depending on the use Posssible explosion proof The impedance between Probe and the wall of Tank i e capacitance and conductance 2 Operation principle and product composition is changed when Probe...

Страница 4: ...0 C Ambient temperature 20 60 C Protection rating Std Weather Proof IP65 Line inlet PF 3 4 F Material Head AL C Connection 304 316 Probe 304 PTFE 316 PTFE Output contact RELAY DPDT Output capacity AC 250V 5A DC 30V 5A Power supply AC 90 240V DC24V Power consumption about 3VA Power consumption about 3VA Response speed 5ms Delay time 0 5 30 sec Operation display LED Dynamic resistance 20 kohm or mor...

Страница 5: ...autions on installation 4 2 Cautions on installation It should have 300 mm or more space between Probes when installing 2 or more level S W on one container It will be unstable due to the effect of interaction between devices when the distance between Probes is short For outdoor installation Sun Cover should be installed to avoid the effect by the temperature rise For the side installation Inactiv...

Страница 6: ...supply according to the power specifications Make sure LED G and LED R are ON when power is supplied This product basically provides DPDT and connects lines by using COM and N O terminals when 6 using a high contact point It should be grounded externally HCC 95P series_M_E HITROL CO LTD ...

Страница 7: ... Relay operation when Sensor detection is released BCD S W Control the sensitivity of Sensor FINE Control the sensitivity of Sensor 1 Connect lines according to the connection diagram 2 Make sure measure objects don t contact PROBE SENSOR 3 Set S W to H BCD to F and Timer to MIN 4 Provide power AC90 240V 5 Turn BCD S W to the left counter clockwise till LED G and LED R are OFF 6 Turn LED G and LED...

Страница 8: ...ion of the sensor part In addition to this Remove all extraneous matters that are adhered to the device when cleaning Tank Check insulation or mechanical damage of Probe if the moving speed of a media is fast or it agitates the media The water proof property of Probe should be checked regularly since lowering the p p p y g y g insulation of Probe causes errors and malfunctions When measuring objec...

Страница 9: ...and closing the product cover 8 3 Cautions on grounding There are two groundings external and internal For external grounding the size There are two groundings external and internal For external grounding the size of a grounding line should be 4 4mmSQ The size of an internal grounding line should be the same as the power line but the size of terminal lugs for the internal grounding should be 3 1 3...

Страница 10: ...ding grounding sockets are located inside of Head and the external grounding 9 3 Product disposal Dispose the product after separating terminal board and body in the container when the product can not be used any more No special care is required because there re no parts that may harm environment for example mercury switch 10 Marks on products 10 1 Product identification Product identification mar...

Страница 11: ...e designed in accordance with Article 34 of the Occupation Safety and Health Act and Article 58 4 of the Enforcement Regulations on the same Act 12 Trouble checks Symptoms Corrective actions Relay operates when measure objects don t contact Probe Adjust the sensitivity again according to the adjusting method Check if there re lots of adherents on the wall of Tank Check whether Lead line of Probe a...

Страница 12: ...13 Outside view of the product 13 2 SENSOR LEQUID HCC 95P GENERAL TYPE HCC 95P HIGH TEMP TYPE 12 HCC 95P series_M_E HITROL CO LTD ...

Страница 13: ...13 Outside view of the product 13 1 SENSOR SOLID HCC 95P GENERAL TYPE HCC 95P HIGH TEMP TYPE 13 HCC 95P series_M_E HITROL CO LTD ...

Страница 14: ...13 Outside view of the product 13 1 SENSOR SOLID 14 HCC 95P series_M_E HITROL CO LTD ...

Страница 15: ... service regardless of the warranty period if the service request is not for malfunctions of the product Service request can be done via our home page or head office 14 2 Contact Information Address 62 182 Bongilcheon Ri Chori yup Paju Si Gyeonggi Do Address 62 182 Bongilcheon Ri Chori yup Paju Si Gyeonggi Do TEL 031 943 0875 6 Head office and Customer Services FAX 031 943 0878 5600 Head office an...

Отзывы: