INSTALLATION
AIR DUCTS
Air duct dimensions will be determined according to the airflow and available pressure of the unit.
Ducts must be designed by qualified technical people.
Use ducts made of non-inflammable materials in order to avoid any risk of fire as a consequence of the
deflagration of gases. It is advisable to use metal sheet duct with insulation.
Use flexible ducts to connect air ducts into the unit and thus avoid vibration and noise transmission.
DESIGN OF THE REFRIGERANT PIPES
Please refer to the instructions stated in the condenstion unit.
ELECTRICAL INSTALLATION
Unit power supply should be within 10% of volts indicated on the unit nameplate. Damage caused by the start-up
of the unit in an incorrect
voltage line is not covered by Hitecsa’s warranty.
When making electrical connections always use the unit wiring diagram.
The line protection elements have to be placed by the installer according to the current legislation local laws.
Must check that the crankcase heater is working prior the start of the unit.
The interconnecting wires have to be located in the protection tube or inside the groove cannel.
Electrical data
CLVBA-CLVA
401
Power supply
V/~/Hz
400.3/N/50
Nominal current
A
1.27
Disconnect main switch from main power supply before starting any type of operations.