Installation Requirements
2–17
Hitachi Universal Storage Platform VM Installation Planning Guide
•
Figure 2-8: Power Supply Locations
PS11
PS12
PS21
PS22
CL1
CL2
PS00
PS01
x 15
PS10
PS11
x 15
PS20
PS21
x 15
PS30
PS31
x 15
DKU-R0
Disk Chass is
SBX-Chassis
DKC
Control Frame
PS00
PS01
x 15
PS10
PS11
x 15
PS20
PS21
x 15
PS30
PS31
x 15
DKU-R1
Disk Chass is
CB
CB
CB
CB
CB
CB
CB
CB
PDU
PD U
PDU
PDU
Primary Rack
30A
Breaker
3 0A
Bre aker
30 A
Breake r
30A
Breaker
PS00
PS01
x 15
PS10
PS11
x 15
PS20
PS21
x 15
PS30
PS31
x 15
DKU-R2
Disk Chassi s
PS00
PS01
x 15
PS10
PS11
x 15
PS20
PS21
x 15
PS30
PS31
x 15
DKU-R3
Disk Chassi s
CB
CB
CB
CB
CB
CB
CB
CB
PDU
PDU
PDU
P DU
Secondary Rack
30A
Breaker
30A
Breaker
30A
Brea ker
30A
Breaker
Maximum Configuration – Control Frame, Additional SVP/Battery Backup Chassis and four Disk Chassis
• Each rack contains four Power Distribution Units (PDU)
• Each PDU includes two groups of four receptacles [IEC 320-C13]
• Each receptacle group has its own Circuit Breaker (CB) 16Amp [20 Amp Trip]
• For systems installed in the Americas the PDU power cord has a 1-Phase, NEMA L6-30P 30A, 250V plug
• For systems installed in EMEA/APAC the PDU power cord has a 1-Phase, IEC 309, 32A, 250V plug
Power Cables
Power Cables
Power Cables
Power Cables
PS = Power Supply
CL1 = Cluster 1, CL2 = Cluster 2
CB = Circuit Breaker
DKU = Disk Chassis
SBX-Chassis = Additional SVP/Battery Backup Chassis
(Power obtained from DKC Control Frame)