GR4000 Installation Guide Version 1.00 - Preliminary
520-10-014-20X
75
Table 2.8-2
Amount of M5/M6 screws used to install a router into a rack
Model
GR4000-80E1 GR4000-80E2 GR4000-160E1
GR4000-
160E2
GR4000-320E AC)
GR4000-320E DC)
Cabinet rack complying
with JIS standard
6 4 8
6 8
Cabinet rack complying
with EIA standard
8 6 8
8 8
2.9
Maintenance Area
Reserve space as shown below as the maintenance area for the GR4000.
(1) Maintenance Area Required for Desk or Table Installation
Figure 2.9-1
Maintenance Area Required for Desk or Table Installation
(2) Maintenance Area Required for Rack Installation
Figure 2.9-2
Maintenance Area Required for Rack Installation
Front
Rack
100
100
Router
(
Unit
:
mm
)
200
Front
Router
1000
200 200
440
490
GR4000-80E1
,
GR4000-160E1
GR4000-80E2
,
GR4000-160E2
,
GR4000-
320E(AC)
,
GR4000-320E(DC)
1000
Front
1000
200
200
(
Unit
:
mm
)
440
674
Router
Содержание GR4000 Series
Страница 1: ...Hitachi Gigabit Router GR4000 Series Installation Guide Version 1 00 Preliminary ...
Страница 98: ...GR4000 Installation Guide Version 1 00 Preliminary 80 520 10 014 20X This page left intentionally blank ...
Страница 152: ...GR4000 Installation Guide Version 1 00 Preliminary 134 520 10 014 20X ...
Страница 164: ...GR4000 Installation Guide Version 1 00 Preliminary 146 520 10 014 20X This page left intentionally blank ...