pairdisplay -g oraHA -fcxe -IH0
7
.
Resume I/O from the servers to the primary and secondary storage
systems.
Planned power off/on of the primary and external storage
systems
Powering off the primary and external storage systems
1
.
Direct server I/O to the secondary storage system.
Using the alternate path software, stop I/O from the servers to the
primary storage system.
2
.
On the secondary storage system, swap and suspend the GAD pairs
(swap suspension).
pairsplit -g oraHA -RS -IH1
3
.
Confirm that the pair status of the P-VOLs of the GAD pairs has changed
to PSUS(Block) and that the pair status of the S-VOLs has changed to
SSWS(Local).
pairdisplay -g oraHA -fcxe -IH1
4
.
On the primary and secondary storage systems, disconnect the quorum
disks.
raidcom disconnect external_grp -ldev_id 0x8888 -IH1
Note:
When you disconnect a quorum disk, SIM (DEF0ZZ*) (quorum disk
blockade) might be issued. If this SIM is issued, delete the SIM after
powering on the storage system and reconnecting the quorum disk.
*ZZ: quorum disk ID
5
.
On the primary and secondary storage systems, verify that the quorum
disks have been disconnected.
raidcom get path -path_grp 1 -IH1
6
.
Power off the storage system at the primary site and the external storage
system.
Powering on the primary and external storage systems
1
.
Power on the storage system at the primary site and the external storage
system.
2
.
Confirm that the primary and secondary storage systems and the external
storage system for the quorum disks do not have any blocked parts.
If any parts are blocked, recover them.
3
.
Check for SIMs about path blockage, and delete the SIMs.
4
.
On the primary and secondary storage systems, establish connections to
the quorum disks.
raidcom check_ext_storage external_grp -ldev_id 0x8888 -IH1
Planned outage of global-active device storage systems
7-7
Hitachi Virtual Storage Platform G1000 Global-Active Device User Guide
Содержание G1000
Страница 8: ...Index viii Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 14: ...xiv Preface Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 60: ...2 22 System requirements Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 80: ...3 20 Planning for global active device Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 128: ...4 48 Configuration and pair management using CCI Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 238: ...9 18 Troubleshooting Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 245: ...Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...