1
90
TROUBLESHOOTING
1.3.6
PROCEDURE OF CHECHING OTHER MAIN PARTS
n
High Voltage Discharge Work for Replacing Parts
%
DANGER:
Perform this high voltage discharge work to avoid an electric shock.
Procedure:
c. Connect the wires to terminals, P and N on transistor
module.
Discharging is started, resulting in hot brazer.
Pay attention not to short-circuit between terminal P and N .
Manufacturing #
“A”
Case
Before U4NG1001
LED3 on PCB5
1
a. Turn OFF the main switches and wait for three minutes.
Check to ensure that no high voltage exists. If “A” is ON
after start-up and “A” is OFF after turning OFF power
source, the voltage will decrease lower than DC50V.
b. Connect connecting wires to an electrical brazer.
After U4NG1002
LED2 on PCB3
2
d. Wait for 2 or 3 minutes and measure the voltage once
again. Check to ensure that no voltage is charged.
[Case 1]
Plug
Brazer
Connecting
wires
Transistor
Module
[Case 2]
Содержание FS3 Series
Страница 2: ......
Страница 4: ......
Страница 114: ......
Страница 190: ......
Страница 191: ...3 MAIN PARTS 19 3 8 CIRCUIT DIAGRAM FOR PRINTED CIRCUIT BOARD OF OUTDOOR UNIT n Control Board 1 PCB1 1 2 ...
Страница 192: ...3 20 MAIN PARTS n Control board 1 PCB1 2 2 ...
Страница 193: ...3 MAIN PARTS 21 n Fan Control Board PCB2 ...
Страница 194: ...3 22 MAIN PARTS n Inverter Board PCB3 n Snubber Board PCB5 ...
Страница 196: ...3 24 MAIN PARTS n Control Board PCB of Indoor Unit Only for RPK Model ...
Страница 197: ...3 MAIN PARTS 25 3 10 CIRCUIT DIAGRAM FOR PRINTED CIRCUIT BOARD OF REMOTE CONTROL SWITCH n PC 2H2 ...
Страница 198: ...3 26 MAIN PARTS n PC 5H ...
Страница 199: ...3 MAIN PARTS 27 3 11 CIRCUIT DIAGRAM FOR PRINTED CIRCUIT BOARD OF RECEIVER ...
Страница 200: ......
Страница 239: ......
Страница 240: ...SMGB0001 06 01 Printed in Spain ...