1
TROUBLESHOOTING
89
1.3.5
SELF - CHECKING OF CENTRAL STATION (PSC-3S1)
This procedure is utilized for regular maintenance check, and if the central station is malfunction.
1
Turn ON the main power switch.
2
Checking of LCD and Indicating Circuit:
Simultaneously depress the following 4 switches, [FAN]
[COOL] and [
¶
] [
D
] of ”UNIT”.
During operation, they can be depressed.
All the LCD indications activated, for 5 seconds.
All the LCD indications deactivated, for 1 second.
By depressing a particular touch type switch, the
corresponding segment is activated.
3
Checking of Touch Type Switch Function:
Depress all the touch type switches one by one. Any one of
the switches can be depressed.
Normal:
After 15 Seconds
Normal
Abnormal
4
Checking of Transmission Circuit:
Automatically checked, and the result will be indicated as
figure right, for 3 seconds.
5
Return to the indication before the self-checking.
88
¶
(Unit)
RTM
Heat
MNTR
Dry
Run/Stop
Cool
Prgm Timer
[blank]
Temp. Indication Part
D
(Unit)
¶
(Temp.)
INDLV
D
(Temp.)
Fan
77
EE
Содержание FS3 Series
Страница 2: ......
Страница 4: ......
Страница 114: ......
Страница 190: ......
Страница 191: ...3 MAIN PARTS 19 3 8 CIRCUIT DIAGRAM FOR PRINTED CIRCUIT BOARD OF OUTDOOR UNIT n Control Board 1 PCB1 1 2 ...
Страница 192: ...3 20 MAIN PARTS n Control board 1 PCB1 2 2 ...
Страница 193: ...3 MAIN PARTS 21 n Fan Control Board PCB2 ...
Страница 194: ...3 22 MAIN PARTS n Inverter Board PCB3 n Snubber Board PCB5 ...
Страница 196: ...3 24 MAIN PARTS n Control Board PCB of Indoor Unit Only for RPK Model ...
Страница 197: ...3 MAIN PARTS 25 3 10 CIRCUIT DIAGRAM FOR PRINTED CIRCUIT BOARD OF REMOTE CONTROL SWITCH n PC 2H2 ...
Страница 198: ...3 26 MAIN PARTS n PC 5H ...
Страница 199: ...3 MAIN PARTS 27 3 11 CIRCUIT DIAGRAM FOR PRINTED CIRCUIT BOARD OF RECEIVER ...
Страница 200: ......
Страница 239: ......
Страница 240: ...SMGB0001 06 01 Printed in Spain ...