background image

Number

Country or

region

Voltage rating

(VAC)

Current rating

(amperes)

Plug type

1

1

North America

100-127

15

NEMA 5-15P

Brazil

200-240

10, 20

NEMA 5-15P

Japan

100-127

12

JIS C8303

Taiwan

100-127

12, 16

CNS 690

2

North America

100-127

20

NEMA 5-20P

3

North America

200-240

20

NEMA L6-20P

3

North America

200-240

30

NEMA L6-30P

4

2

North America

200-240

30

NEMA L15-30P

5

3

Hong Kong

200-240

13

BS-1363

Singapore

200-240

13

BS-1363

6

Chile

200-240

10, 16

CEI 23-50

Italy

200-240

10, 16

CEI 23-50

7

Argentina

200-240

10, 15

IRAM 2073

Australia

200-240

10, 15

AS-3112

China

200-240

10, 16

GB-1002

New Zealand

200-240

10, 15

AS-3112

8

Denmark

200-240

10

DK 2-5

Israel

200-240

10, 16

SI-32

9

4

Europe

200-240

CEE 7, 7

10

5

India

200-240

6, 16

IS-1293

South Africa

200-240

10, 16

SABS-164

11

Switzerland

200-240

10

SEV 1011

12

6

International

200-240

20

IEC 309

13

7

United

Kingdom

200-240

13

BS-1363

International

200-240

20

IEC 309

14

8

International

200-240

30

IEC 309

Power cable assemblies

Appendix D: Data and power cables

Hitachi Virtual Storage Platform G900 Hardware Reference Guide

105

Содержание 88-06-0x

Страница 1: ... 06 0x Hardware Reference Guide This document provides information about the system hardware components and the mechanical and environmental specifications for the Hitachi Virtual Storage Platform G900 storage system MK 97HM85014 06 July 2020 ...

Страница 2: ... to be held retrieved deleted or otherwise processed in accordance with relevant laws Notice on Export Controls The technical data and technology inherent in this Document may be subject to U S export control laws including the U S Export Administration Act and its associated regulations and may be subject to export or import regulations in other countries Reader agrees to comply strictly with all...

Страница 3: ...ont panel LEDs without bezel 16 CBL controller rear panel LEDs 18 CBL controller power supply unit LEDs and connectors 18 Host Network and Drive Tray Ports and LEDs 19 Front end modules 19 10 Gbps iSCSI board LEDs and connectors optical 20 10 Gbps iSCSI board LEDs and connectors copper 20 8 Gbps 16 Gbps or 32 Gbps Fibre Channel 4 port board LEDs and connectors 22 16 Gbps Fibre Channel 2 port board...

Страница 4: ...apter 4 Host port expansion chassis 44 Host port expansion chassis front panel bezel LEDs 44 PCIe switchboard 44 Host port expansion chassis fan 45 PCIe cable connector 46 Host port expansion chassis power supply 47 Chapter 5 Service processor 49 Service Processor Windows 10 Enterprise hardware specifications 49 Service processor description 50 SVP Windows 10 Enterprise front panel 51 SVP Windows ...

Страница 5: ... distribution units for Hitachi Universal V2B Rack 109 Americas single phase PDU 1P30A 8C13 3C19UL P 109 Americas single phase PDU 1P30A 15C13 3C19UL P 110 Americas three phase PDU 3P30A 8C13 3C19UL P 111 Americas three phase PDU 3P30A 15C13 3C19UL P 111 Americas three phase PDU 3P30A 24C13 6C19UL P 112 APAC and EMEA single phase PDU 1P32A 9C13 3C19CE P 113 APAC and EMEA single phase PDU 1P32A 18C...

Страница 6: ...arge form factor drive tray 126 Flash module drive tray 127 Dense intermix drive tray 128 CBL controller 129 Dense intermix drive tray power supply 129 CMA used to secure dense intermix drive tray 130 Battery 130 Host port expansion chassis 130 PCIe switch board 131 Appendix H Environmental notices 133 Appendix I Regulatory compliance 134 Contents Hitachi Virtual Storage Platform G900 Hardware Ref...

Страница 7: ... Development Kit website http sourceforge net apps mediawiki tianocore index php title UDK2010 2004 Intel Corporation All rights reserved Redistribution and use in source and binary forms with or without modification are permitted provided that the following conditions are met Redistributions of source code must retain the above copyright notice this list of conditions and the following disclaimer...

Страница 8: ...ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE Product version This document revision applies to VSP G900 firmware 88 06 0x or later Release notes Read the release notes before installing and using this product They may contain requirements or restrictions that are not fully described in this document or updates or corrections to this document ...

Страница 9: ...lowing scenarios Variables are not clearly separated from the surrounding text or from other variables Example Status report name file version csv Variables in headings square brackets Indicates optional values Example a b indicates that you can choose a b or nothing braces Indicates required or expected values Example a b indicates that you must choose either a or b vertical bar Indicates that yo...

Страница 10: ...lculated based on the following values Physical capacity unit Value 1 kilobyte KB 1 000 103 bytes 1 megabyte MB 1 000 KB or 1 0002 bytes 1 gigabyte GB 1 000 MB or 1 0003 bytes 1 terabyte TB 1 000 GB or 1 0004 bytes 1 petabyte PB 1 000 TB or 1 0005 bytes 1 exabyte EB 1 000 PB or 1 0006 bytes Logical capacity values for example logical device capacity cache memory capacity are calculated based on th...

Страница 11: ...o Hitachi Vantara Support Connect for contact information https support hitachivantara com en_us contact us html Hitachi Vantara Community is a global online community for Hitachi Vantara customers partners independent software vendors employees and prospects It is the destination to get answers discover insights and make connections Join the conversation today Go to community hitachivantara com r...

Страница 12: ...t fails Adding and replacing components along with firmware upgrades can be conducted while the storage system is active and without interruption of data availability to the hosts A hot spare drive can be configured to replace a failed data drive automatically securing the fault tolerant integrity of the logical drives Self contained hardware based RAID logical drives provide maximum performance i...

Страница 13: ...ory at the time of a power outage Scalability and versatility Supports small form factor drive trays DBS DBSE requiring 2U of rack space and up to 24 2 5 inch HDDs and or flash drives can be installed Supports large form factor drive trays DBL DBLE requiring 2U of rack space and up to 12 3 5 inch HDDs can be installed Supports high density intermix drive tray DB60 requiring 4U of rack space and a ...

Страница 14: ...ith LED indicators for monitoring its operating conditions and notifying possible component replacement CBL controller chassis The controller chassis houses controllers backup fan modules and power supplies The chassis also includes specific functional LEDs located on the front and rear of controller to provide its operating status The following table lists the controller board specifications Comp...

Страница 15: ... not blink even if the following failure service information messages SIM are issued 452xxx 462xxx 3077xx 4100xx and 410100 LED might turn off during user maintenance 4 ALARM LED Off Normal operation Red Processor failure system might be down For assistance contact customer support https support hitachivantara com en_us contact us html 5 POWER ON OFF main switch Powers the storage system CBL contr...

Страница 16: ...bes the definitions of the CBL controller front panel LEDs Number Item Description 1 POWER ON OFF main switch Powers the storage system 2 POWER READY WARNING and ALARM LEDs Note When System Option Mode 1097 is set to ON the WARNING LED does not blink even if the following failure service information messages SIM are issued 452xxx 462xxx 3077xx 4100xx and 410100 3 Controllers Controller 1 bottom an...

Страница 17: ... unit of the controller Amber LAN reset switch was pressed 9 LAN RST switch Use only when instructed by customer support 10 STATUS LED for BKMF Green Charging of the battery in the backup module is complete Red Backup module can be removed Blink red one time Main battery failure Blink red two times Backup battery failure Blink red three times Both batteries failed or preventive maintenance replace...

Страница 18: ... following table describes the definitions of the CBL controller rear panel LEDs Number Item 1 Power supply unit 2 Front end module 3 Back end module 4 LAN blade CBL controller power supply unit LEDs and connectors The following table lists the definitions of the CBL controller power supply unit LEDs and connectors CBL controller rear panel LEDs Chapter 2 System controller Hitachi Virtual Storage ...

Страница 19: ...stem The component LEDs display the operating status of the storage system Front end modules The front end modules FEMs also called channel boards CHBs control the transfer of data between the host and cache memory VSP G130 G F350 G F370 G F700 G F900 storage systems support Fibre Channel FC and iSCSI FEMs for attachment to host servers The front end module LEDs indicate the operating status of th...

Страница 20: ... 2 PORT LED Red Small form factor SFF pluggable can be removed Blue Normal link status Blink blue Front end module is in communication status 3 iSCSI connectors Connect to Ethernet cables 10 Gbps iSCSI board LEDs and connectors copper 10 Gbps iSCSI board LEDs and connectors optical Chapter 2 System controller Hitachi Virtual Storage Platform G900 Hardware Reference Guide 20 ...

Страница 21: ...nk Green 10 Gbps link Off No link connection 3 PORT LED Green Link connection is established Blinking Communication is in progress Off No link connection or not ready to communicate 4 iSCSI connectors Connect to Ethernet cables 10 Gbps iSCSI board LEDs and connectors copper Chapter 2 System controller Hitachi Virtual Storage Platform G900 Hardware Reference Guide 21 ...

Страница 22: ...removed Blue Normal link status at 8 Gbps Green Normal link status at 2 Gbps or 4 Gbps Table 2 32 Gbps 16 Gbps Fibre Channel Number Item Description 1 Fibre Channel connectors Connect to Fibre Channel cables 2 STATUS LED Green Front end module is in power on state Red Front end module can be removed safely 3 PORT LED Red Small form factor SFF pluggable can be removed 8 Gbps 16 Gbps or 32 Gbps Fibr...

Страница 23: ...ght Port 1 Port 2 Port 3 Port 4 CHB 1A 1A 3A 5A 7A CHB 1B 1B 3B 5B 7B CHB 1C 1C 3C 5C 7C CHB 1D 1D 3D 5D 7D CHB 1E 1E 3E 5E 7E CHB 1F 1F 3F 5F 7F CHB 1G 1G 3G 5G 7G CHB 1H 1H 3H 5H 7H CHB 2A 2A 4A 6A 8A CHB 2B 2B 4B 6B 8B CHB 2C 2C 4C 6C 8C CHB 2D 2D 4D 6D 8D CHB 2E 2E 4E 6E 8E CHB 2F 2F 4F 6F 8F CHB 2G 2G 4G 6G 8G CHB 2H 2H 4H 6H 8H 8 Gbps 16 Gbps or 32 Gbps Fibre Channel 4 port board LEDs and co...

Страница 24: ...uggable can be removed Blue Normal link status at 16 Gbps Green Normal link status at 4 Gbps or 8 Gbps 3 Fibre Channel connectors Connect to Fibre Channel cables Port assignments CHB number 16 Gbps Fibre Channel ports left to right Port 1 Port 2 CHB 1A 1A 3A CHB 1B 1B 3B 16 Gbps Fibre Channel 2 port board LEDs and connectors Chapter 2 System controller Hitachi Virtual Storage Platform G900 Hardwar...

Страница 25: ...B 1D 1D 3D CHB 1E 1E 3E CHB 1F 1F 3F CHB 1G 1G 3G CHB 1H 1H 3H CHB 2A 2A 4A CHB 2B 2B 4B CHB 2C 2C 4C CHB 2D 2D 4D CHB 2E 2E 4E CHB 2F 2F 4F CHB 2G 2G 4G CHB 2H 2H 4H PCIe module PCIe module Chapter 2 System controller Hitachi Virtual Storage Platform G900 Hardware Reference Guide 25 ...

Страница 26: ... cable is connected it can be removed safely LAN blade LEDs and connectors Number Item Description 1 LINK LED Green Link status is normal 2 ACT LED Orange Data is being transferred 3 LAN 2 LAN port used by the user 4 LAN 1 Maintenance LAN port used by service personnel 5 LAN ALARM LED Red LAN blade can be removed 6 Uninterruptible power supply UPS port N A LAN blade LEDs and connectors Chapter 2 S...

Страница 27: ...g status of the module Number Item Description 1 STATUS LED Green Back end module is in the power on state Red Back end module can be removed safely 2 PORT LED Blue Link status is normal 3 PATH 0 connector Connect to a drive tray 4 PATH 1 connector Connects to a drive tray Back end modules Chapter 2 System controller Hitachi Virtual Storage Platform G900 Hardware Reference Guide 27 ...

Страница 28: ...ion ports conventional hard disk drives HDD are not included or configurable with all flash arrays Small form factor drive tray DBS DBSE The following describes the physical specifications of the small form factor drive tray Name Model name Height Number of drive slots Drive type DBS DW F800 DBSC 2U 88 2 mm 24 2 5 inch SFF DBSE DW F800 DBSE 2U 88 2 mm 24 2 5 inch SFF SFF with front panel bezel Num...

Страница 29: ...ezel Number Item Description 1 POWER READY and LOCATE LEDs Green Drive tray is powered on Green Drive tray is operational Amber Indicates the location of the chassis Can be turned on or turned off by the maintenance utility 2 ALM LED Red Drive stopped due to a failure and can be replaced 3 ACT LED Green Normal operation SFF front panel without bezel Chapter 3 Drive trays Hitachi Virtual Storage Pl...

Страница 30: ... Description 1 ENC N A 2 POWER LED Green ENC is in the power on state 3 Locate LED Amber Indicates the location of the chassis Can be turned on or turned off by the maintenance utility 4 ALARM LED Red ENC can be replaced 5 PATH IN LED Blue IN side port is linked up 6 PATH IN connector Connects to a controller or drive tray SFF rear panel Chapter 3 Drive trays Hitachi Virtual Storage Platform G900 ...

Страница 31: ...l operation AC power supply unit LEDs and connectors Both SFF and LFF drive trays are equipped with AC power supply units The AC power supply units include LEDs to display its operating status Note The DBS and DBL power supply has a Silver efficiency rating The DBSE and DBLE power supply has a Platinum efficiency rating Number Item Description 1 RDY LED Green Normal operation 2 ACI IN LED Green AC...

Страница 32: ... F800 DBLC 2U 88 2 mm 12 3 5 inch LFF DBLE DW F800 DBLE 2U 88 2 mm 12 3 5 inch LFF LFF with front panel bezel Number Item Description 1 POWER LED Green Drive tray is powered on 2 READY LED Green Drive tray is operational 3 Locate LED Amber Indicates the location of the chassis Can be turned on or turned off by the maintenance utility Large form factor drive tray DBL DBLE Chapter 3 Drive trays Hita...

Страница 33: ...is powered on Green Drive tray is operational Amber Indicates the location of the chassis Can be turned on or turned off by the maintenance utility 2 ACT LED Green Normal operation Blink green Drive is being accessed 3 ALM LED Red Drive stopped due to a failure and can be replaced LFF front panel without bezel Chapter 3 Drive trays Hitachi Virtual Storage Platform G900 Hardware Reference Guide 33 ...

Страница 34: ...in the power on state 3 Locate LED Amber Indicates the location of the chassis Can be turned on or turned off by the maintenance utility 4 ALARM LED Red ENC can be replaced 5 PATH IN LED Blue IN side port is linked up 6 PATH IN connector Connects to a controller or drive tray 7 PATH OUT LED Blue OUT side port is linked up 8 PATH OUT connector Connects to a drive tray LFF rear panel Chapter 3 Drive...

Страница 35: ...drive trays are equipped with AC power supply units The AC power supply units include LEDs to display its operating status Note The DBS and DBL power supply has a Silver efficiency rating The DBSE and DBLE power supply has a Platinum efficiency rating Number Item Description 1 RDY LED Green Normal operation 2 ACI IN LED Green AC input is operating normally 3 ALM LED Red Power supply unit can be re...

Страница 36: ...ont panel bezel Number Item Description 1 POWER LED Green Drive tray is powered on 2 READY LED Green Drive tray is operational 3 Locate LED Amber Indicates the location of the chassis Can be turned on or turned off by the maintenance utility 4 Lock Locks and unlocks the front panel bezel by using the supplied key Flash module drive tray DBF Chapter 3 Drive trays Hitachi Virtual Storage Platform G9...

Страница 37: ...ks for about two to five minutes until the startup processing is complete ALM LED Red Drive stopped due to a failure and can be replaced Note ACT indicator is only printed on some types of FMDs 3 POWER READY and LOCATE LEDs Green Drive tray is powered on Green Drive tray is operational FMD front panel without bezel Chapter 3 Drive trays Hitachi Virtual Storage Platform G900 Hardware Reference Guid...

Страница 38: ...Slots are organized the following way 9 10 11 6 7 8 3 4 5 0 1 2 FMD rear panel Number Item Description 1 ENC N A 2 POWER LED Green ENC is in the power on state 3 Locate LED Amber Indicates the location of the chassis Can be turned on or turned off by the maintenance utility FMD rear panel Chapter 3 Drive trays Hitachi Virtual Storage Platform G900 Hardware Reference Guide 38 ...

Страница 39: ...orage system 11 Three LEDS top to bottom RDY LED AC IN LED ALM REPLACE LED Green Power supply unit is operating normally Green Power supply unit is operating normally Red Power supply unit can be replaced High density intermix drive tray DB60 The following describes the physical specifications of the high density drive tray Name Model name Height Number of drive slots Drive type DB60 DW F800 DB60C...

Страница 40: ...ray is operational 3 Locate LED Amber Indicates the location of the chassis Can be turned on or turned off by the maintenance utility 4 Lock Locks and unlocks the front panel bezel by using the supplied key Dense intermix drive tray with front panel bezel Chapter 3 Drive trays Hitachi Virtual Storage Platform G900 Hardware Reference Guide 40 ...

Страница 41: ...can be replaced Note At the rear of the drive tray the drives are organized from left to right On the left side of the preceding figure the rear of the drive tray is at the top Rear of drive tray 48 59 36 47 24 35 12 23 Front of drive tray 00 11 Dense intermix drive tray display LEDs Chapter 3 Drive trays Hitachi Virtual Storage Platform G900 Hardware Reference Guide 41 ...

Страница 42: ...ble provided with the storage system 6 ENC N A 7 PATH OUT LED Blue OUT side port is linked up 8 PATH OUT connector Connects to a drive tray 9 PATH IN LED Blue IN side port is linked up 10 PATH IN connector Connects to a controller or drive tray 11 Console This port is reserved 12 ALARM LED Red ENC can be replaced Dense intermix drive tray rear panel Chapter 3 Drive trays Hitachi Virtual Storage Pl...

Страница 43: ...he location of the chassis Can be turned on or turned off by the maintenance utility 14 POWER LED Green ENC is in the power on state Dense intermix drive tray rear panel Chapter 3 Drive trays Hitachi Virtual Storage Platform G900 Hardware Reference Guide 43 ...

Страница 44: ...and iSCSI and FC cards For more information contact customer support Host port expansion chassis front panel bezel LEDs Number Item Description 1 POWER LED Green Host port expansion is turned on Amber PCIe module is turned on Off PCIe module is turned off 2 Safety lock Lock or unlock the front bezel PCIe switchboard Chapter 4 Host port expansion chassis Hitachi Virtual Storage Platform G900 Hardwa...

Страница 45: ...replaced safely Off PCIe switchboard is powered off Host port expansion chassis fan Number Item Description 1 ALM LED Red Fan failure has occurred Off Normal operation Host port expansion chassis fan Chapter 4 Host port expansion chassis Hitachi Virtual Storage Platform G900 Hardware Reference Guide 45 ...

Страница 46: ... 3 0 8 Gbps is linked up normally Off Basic PCIe is not linked up PCIe cable might not be connected If a cable is connected it can be removed safely 3 InAct Basic LED Amber Basic PCIe status changed from link up to link down and cables Cables can be removed safely Off Basic PCIe is normal or not set PCIe cable connector Chapter 4 Host port expansion chassis Hitachi Virtual Storage Platform G900 Ha...

Страница 47: ...tion PCIe status changed from link up to link down and cables Cables can be removed safely Off Option PCIe is normal or not set Host port expansion chassis power supply Number Item Description 1 ALM RDY LED Red Host port expansion chassis power supply can be replaced safely Green Normal operation Host port expansion chassis power supply Chapter 4 Host port expansion chassis Hitachi Virtual Storage...

Страница 48: ...umber Item Description 2 AC IN LED Blue AC input is normal Host port expansion chassis power supply Chapter 4 Host port expansion chassis Hitachi Virtual Storage Platform G900 Hardware Reference Guide 48 ...

Страница 49: ...or OS and Hypervisor support report at https support hitachivantara com en_us interoperability html Service Processor Windows 10 Enterprise hardware specifications The following table lists the hardware specifications for the service processor Windows 10 Enterprise provided by Hitachi Vantara Item Specification Dimensions Height 1 7 inches 43 mm Width 17 2 inches 437 mm Depth 9 8 inches 249 mm Wei...

Страница 50: ... the controllers and the IP network are configured as a bridge The SVP can be addressed using the default IP address 192 168 0 15 In the unlikely event you cannot connect to the SVP using the default IP address use the following emergency login http default SVP IP address dev storage model number system serial number emergency do For example Storage system model number Storage system serial number...

Страница 51: ...with LEDs a reset button and a power button Table 3 SVP Windows 10 Enterprise front panel Item Description 1 LED left to right N A LAN card 2 LAN card 1 Hard drive System standby power 2 Reset button 3 Power button SVP Windows 10 Enterprise rear panel The only ports used at the rear panel of the physical SVP are the power socket and the four LAN ports The following ports connect to your IP network...

Страница 52: ...event loops connect the user LAN port on controllers 1 and 2 to an Ethernet switch that is also connected to the LAN1 port on the SVP Note The SVP s default MTU size is 1500 After the Initial Startup Wizard is complete the SVP can be used in non bridge mode In this mode the cables can be removed from SVP ports LAN3 and LAN4 and attached to switches For more information contact customer support SVP...

Страница 53: ... Before you begin Ensure that all software specific shutdown procedures have been completed Refer to the applicable user manuals for details Ensure that all I O activity to the storage system has stopped You can vary paths offline and shut down the attached hosts Procedure 1 Press the main switch on the controller chassis for approximately three seconds until the POWER LED on the front of the chas...

Страница 54: ... the storage system in a place where the ambient temperature is 86 F 30 C or less on average Periodic parts replacement is required If you have a maintenance service contract parts are replaced periodically according to the terms of the contract Note The battery protects the data in the cache memory in an emergency such as a sudden power failure In these cases follow the normal power down procedur...

Страница 55: ...ve the SAS cable 2 To remove an optical cable push the top of the connector of the optical cable 1 to release the latch and remove the SAS cable 2 To remove a LAN cable push the top of the LAN cable connector 1 to release the latch and remove the LAN cable 2 Removing cables Chapter 6 Maintaining the storage system Hitachi Virtual Storage Platform G900 Hardware Reference Guide 55 ...

Страница 56: ...VSP G900 parts list The VSP G900 includes the following standard and optional components Table 5 CBL controller components Model number Part description Quantity DW850 CBL 4U chassis 1 Power supply unit 2 LAN board LAN UPS 2 Backup module BKM 8 Front bezel 4U 1 Binder 1 SAS cable label 2 DW F800 RRCB Rail kit 1 DW F800 BAT Battery 6 Appendix A Storage system parts list Hitachi Virtual Storage Plat...

Страница 57: ...ront end module 32 16 Gbps 4port FC 2 20 DW F800 1HP8 PCIe switchboard also known as a channel board 2 DW F800 PC1F PCIe cable 1 5m 2 DW F800 BS12G Back end module also known as disk board 0 8 DW F800 BS12GE Back end module with encryption 0 8 DW F800 1PS16 SFP for 16 Gbps Shortwave 0 80 DW F800 1PL16 SFP for 16 Gbps Longwave 0 80 DW F800 1PL32 SFP for 32 Gbps Longwave 0 80 DW F800 BAT Battery 0 6...

Страница 58: ...810I 2R4JGM 2 4 TB 2 5 inch 10kmin 12 Gbps SAS drive 0 24 DKC F810I 960MGM 960 GB MLC 12 Gbps SFF flash drive 0 24 DKC F810I 1R9MGM 1 9 TB MLC TLC 12 Gbps SFF flash drive 0 24 DKC F810I 1T9MGM 1 9 TB TLC 12 Gbps SFF flash drive 0 24 DKC F810I 3R8MGM 3 8 TB MLC TLC 12 Gbps SFF flash drive 0 24 DKC F810I 7R6MGM 7 6 TB TLC 12 Gbps SFF flash drive 0 24 DKC F810I 15RMGM 15 TB TLC 12 Gbps SFF flash driv...

Страница 59: ... F810I 2R4JGM 2 4 TB 2 5 inch 10kmin 12 Gbps SAS drive 0 24 DKC F810I 960MGM 960 GB MLC 12 Gbps SFF flash drive 0 24 DKC F810I 1R9MGM 1 9 TB MLC TLC 12 Gbps SFF flash drive 0 24 DKC F810I 1T9MGM 1 9 TB TLC 12 Gbps SFF flash drive 0 24 DKC F810I 3R8MGM 3 8 TB MLC TLC 12 Gbps SFF flash drive 0 24 DKC F810I 7R6MGM 7 6 TB TLC 12 Gbps SFF flash drive 0 24 DKC F810I 15RMGM 15 TB TLC 12 Gbps SFF flash dr...

Страница 60: ...e 0 12 DKC F810I 14RH9M 14 TB 3 5 inch 7 2kmin 12 Gbps SAS drive 0 12 Table 13 DBLE drive tray components Model number Part description Quantity DW F800 DBLE 2U chassis 1 ENC 2 AC power supply unit 2 Front bezel 2U 1 DW F800 RRDB Rail kit 1 Table 14 DBLE optional drive tray components Model number Part description Quantity DKC F810I 6R0H9M 6 TB 3 5 inch 7 2kmin 12 Gbps SAS drive 0 12 DKC F810I 10R...

Страница 61: ...Front bezel 2U 1 DW F800 RRDBF Rail kit 1 Table 16 DBF optional drive tray components Model number Part description Quantity DKC F810I 3R2FN 3 5 TB MLC 12 Gbps flash module drive 0 12 DKC F810I 7R0FP 7 TB MLC TLC 12 Gbps flash module drive 0 12 DKC F810I 14RFP 14 TB MLC TLC 12 Gbps flash module drive 0 12 VSP G900 parts list Appendix A Storage system parts list Hitachi Virtual Storage Platform G90...

Страница 62: ... components Model number Part description Quantity DKC F810I 1R2J7MC 1 2 TB 2 5 inch 10kmin 12 Gbps SAS drive 0 60 DKC F810I 2R4J8M 2 4 TB 2 5 inch 10kmin 12 Gbps SAS drive 0 60 DKC F810I 6R0HLM 6 TB 3 5 inch 7 2kmin 12 Gbps SAS drive 0 60 DKC F810I 10RHLM 10 TB 3 5 inch 7 2kmin 12 Gbps SAS drive 0 60 DKC F810I 14RHLM 14 TB 3 5 inch 7 2kmin 12 Gbps SAS drive 0 60 VSP G900 parts list Appendix A Sto...

Страница 63: ... P Service processor Windows 10 Enterprise 1 Drive tray and drive configuration The following table lists the supported maximum mountable drive trays and data drives for the VSP G900 storage system Controller chassis Number of mountable drive trays Maximum number of mountable drives Drive trays Maximum SAS drive Solid state drive Flash module drive FMD CBL DBS DBSE 48 1 152 1 152 N A DBL DBLE 48 5...

Страница 64: ...2 pole power cable with grounding terminal AC 250 V 13 A or 15 A A F6516 P620 Power cable for PDU 1 A F6516 P630 Power cable for PDU 1 Table 22 SAS cables Model number Specification DW F800 SCQ1 1 m SAS cable including omega clip 2 DW F800 SCQ1F 1 5 m SAS cable including omega clips 2 DW F800 SCQ3 3 m SAS cable including omega clips 2 DW F800 SCQ5 5 m SAS cable including omega clips 2 DW F800 SCQ1...

Страница 65: ...LC optical cable for optical A 6515 HM10L 10 m LC LC optical cable for optical A 6515 HM20L 20 m LC LC optical cable for optical A 6515 HM30L 30 m LC LC optical cable for optical A 6515 HM50L 50 m LC LC optical cable for optical A 6515 HM100L 100 m LC LC optical cable for optical A 6515 HM200L 200 m LC LC optical cable for optical A 6515 HM300L 300 m LC LC optical cable for optical A 6515 JM5L 5 m...

Страница 66: ...number Specification A 6515 JM300L 300 m LC LC optical cable for optical Data and power cable model list Appendix A Storage system parts list Hitachi Virtual Storage Platform G900 Hardware Reference Guide 66 ...

Страница 67: ...IA unit 2 4U Heat output W 338 W Power consumption VA 363 VA Air flow m3 min 3 6 0 m3 min Notes 1 The start up time might be longer in proportion to the number of drive trays connected With a maximum configuration 1 controller chassis and 19 drive trays start up time is approximately 8 minutes 2 Can be mounted on the RKU rack For the mounting special rails for the rack and decoration panels are re...

Страница 68: ... up time min 1 DBS DBSE 5 to 10 min DBL DBLE DBF DB60 Required height EIA unit 2 DBS DBSE 2U DBL DBLE DBF DB60 4U Heat output W DBS DBSE 116 W DBL DBLE 124 W DBF 120 W DB60 184 W Power consumption VA DBS DBSE 126 VA DBL DBLE 144 VA DBF 130 VA DB60 191 VA Air flow m3 min 3 DBS DBSE 2 2 m3 min DBL DBLE 2 2 m3 min DBF 1 6 m3 min VSP G900 mechanical specifications Appendix B System specifications Hita...

Страница 69: ... drive trays start up time is approximately 8 minutes 2 Can be mounted on the RKU rack For the mounting special rails for the rack and decoration panels are required separately depending on the number of the mounted storage systems 3 The value is at maximum level VSP G900 mechanical specifications Appendix B System specifications Hitachi Virtual Storage Platform G900 Hardware Reference Guide 69 ...

Страница 70: ... Using 15 TB 2 5 inch SFF SSD 15 766 TiB Using 14 TB FMD 7 372 TiB Using 30 TB 2 5 inch SFF SSD 31 531 TiB Maximum mountable quantity unit 1 DBS DBSE 24 total per chassis 1 152 maximum per system DBL DBLE 12 576 DBF 12 576 DB60 60 1 140 Maximum number of spare drives2 DBS DBSE 64 DBL DBLE DB60 DBF Note 1 When mounting storage system and mixing DBS DBSE DBL DBLE DBF and DB60 drive trays the maximum...

Страница 71: ...iSCSI Copper 32 Number of ports With CHBB installed 16 32 Gbps FC Optical 80 10 Gbps iSCSI Optical 40 10 Gbps iSCSI Copper 40 Transferred block size bytes 512 Maximum number of hosts via FC switch 255 Maximum number of hosts via network switch 255 Battery life Storage system intake temperature CBL Up to 75 2º F 24º C 5 years Up to 86º F 30º C 5 years Up to 93 2º 34º C 4 years Up to 104º 40º C 3 ye...

Страница 72: ...D6 RAID 5 or RAID 1 provides redundancy and enhances data reliability However there is still a possibility of losing data caused by unforeseeable hardware or software failure Users should always follow recommended best practices and back up all data Internal logic specifications CBL Item Specification Control memory Flash memory 32 MB L3 cache memory 4 MB SDRAM 1 GB Data assurance method Data bus ...

Страница 73: ...mA 1min Insulation resistance DC 500 V 10 MΩ or more Electrical specifications The electrical input power specifications for the storage systems are described in the following table Item Controller Drive tray Input voltage operable voltage range V AC 200 240 6 11 SFF LFF FMD and dense intermix drive tray AC 200 240 6 11 Frequency Hz 50 60 1 Number of phases cabling Single phase with protective gro...

Страница 74: ... or less Notes 1 The power current of Nx2 described in this table is required for a single power unit 2 If one power unit fails another power unit requires electric current for the two power units Therefore plan the power supply facility so that the current carrying capacity for one power unit can provide the total capacity for two power units 3 This table shows the power requirement 100 V or 200 ...

Страница 75: ... 14 F to 122 F 10 C to 50 C 14 F to 122 F 10 C to 50 C 14 F to 122 F 10 C to 50 C Transport storage 22 F to 140 F 30 C to 60 C 22 F to 140 F 30 C to 60 C 22 F to 140 F 30 C to 60 C Temperature change rate C h 10 C or less State Controller FMD tray Operating 50 F to 104 F 10 C to 40 C DKC F810I 1R6FN 3R2FN 6R4FN 7R0FP 14RFP drive is installed 50 F to 104 F 10 C to 40 C Non operating 14 F to 122 F 1...

Страница 76: ...or less 5 to 300Hz Within 5 seconds resonance point 10 Hz or less Non operating m s2 5 0 or less at 5 Hz to 300 Hz no damage to product 9 8 1 0 G Ensure own safety with fall prevention Within 5 seconds resonance point 10 Hz or less Transport packed m s2 5 0 or less Impact State CBL controller and drive trays Operating m s2 20 or less 10 ms half sine wave Non operating 50 or less Environmental spec...

Страница 77: ...0 C to 40 C Non operating m 60 to 12 000 Note 1 Meets the highest allowable temperature conditions and complies with ASHRAE American Society of Heating Refrigerating and Air Conditioning Engineers 2011 Thermal Guidelines Class A3 The maximum value of the ambient temperature and the altitude is from 40ºC at an altitude of 950m 3000 feet to 28ºC at an altitude of 3050m 1000 feet The allowable ambien...

Страница 78: ...nes Class A2 The maximum value of the ambient temperature and the altitude is from 35ºC at an altitude of 950m 3000 feet to 28ºC at an altitude of 3050m 1000 feet The allowable ambient temperature is decreased by 1ºC for every 300m increase in altitude above 950m Gaseous contaminant Avoid areas exposed to corrosive gas and salty air State Controller FMD DBS DBSE DBL DBLE and DB60 drive trays Opera...

Страница 79: ...1 5m in the rack Measurement position 1m away from the front rear left or right side of the storage system and 1 5m high at four points Measurement value Energy average value of the four points front rear left and right The recommendation is to install the storage system in a computer room in a data center It is possible to install the storage system in a general office however take measures again...

Страница 80: ...ture environment or if a failure occurs in the system 2 Sound pressure level LA changes from 66 dB or 75 dB according to the ambient temperature drive configuration and operating status Maximum volume can reach 79 dB during maintenance procedure for a failed ENC or power supply 3 Acoustic power level LwA measured by the ISO 7779 standard is 7 2 B This value changes from 7 2 B to 8 1 B according to...

Страница 81: ...Level State Condition Operating Recommended 90 dB or less Note Fire suppression systems and acoustic noise Some data center inert gas fire suppression systems when activated release gas from pressurized cylinders that moves through the pipes at very high velocity The gas exits through multiple nozzles in the data center The release through the nozzles could generate high level acoustic noise Simil...

Страница 82: ...urces such as emergency sirens 4 If it can be safely done without risk of personal injury shut down the storage systems to avoid data loss and damages to the hard disk drives in the storage systems Damage to the hard disk drives from fire suppression systems or pneumatic sirens will void the hard disk drive warranty Mechanical environmental conditions Item Operating Non operating Guaranteed value ...

Страница 83: ...ory capacity required for adding shard memory function vary depending on storage system models Software Items affected by shared memory capacity ShadowImage TrueCopy Universal Replicator global active device The number of pairs that can be created For more information refer to the specific software user guide Volume Migration Volume Migration V2 The number of migration plans that can be executed c...

Страница 84: ...unt of shared memory function to shared memory capacity Table 25 Shared memory function and shared memory capacity Shared Memory Function VSP G900 Base 108 5 GiB Extension1 124 5 GiB Extension2 140 5 GiB Extension3 156 5 GiB Table 26 Minimum cache memory capacity required for shared memory function Shared Memory Function VSP G900 Base 256 GiB Extension1 256 GiB Extension2 256 GiB Extension3 256 Gi...

Страница 85: ...mand Suite or Hitachi Ops Center Administrator Allow communication to the storage system from the SVP TCP IP port assignments When you install your storage system default ports must be opened to allow for incoming and outgoing requests Review the following ports before you install the storage system to avoid conflicts between the TCP IP port assignments used by the storage system and those used by...

Страница 86: ...rt that Device Manager Storage Navigator uses refer to the Device Manager Storage Navigator online help 5989 Used by SMI S 10995 TCP Device Manager Storage Navigator and Hitachi suite components 23015 Used for Web browser communications 23016 Used for Web browser communications via SSL 28355 TCP Device Manager Storage Navigator Secure 31001 Used for communication by Hitachi Command Control Interfa...

Страница 87: ...ssLoade r RMI 51099 No RMIClassLoade rHttps RMI SSL 5443 No RMIIFRegist RMI 1099 No PreRMIServer RMI 51100 513551 No Automatic allocation 88 02 0x xx 00 or later DKCManPrivate RMI 11099 N A 88 02 0x xx 00 or later SMI S SLP SLP 427 Yes only if SMI S is not used SMIS_CIMOM SMI S 5989 62441 Yes only if SMI S is not used 88 02 0x xx 00 or later Automatic allocation 88 02 0x xx 00 or later CommonJetty...

Страница 88: ...ts available for host connections vary based on the controller model Fibre Channel SFP adapters are used to connect to your Fibre Channel switch and hosts iSCSI ports come in optical and copper RJ 45 interfaces and are used to connect to your Ethernet switch and hosts Each controller also has A SAS port for connection to an external drive tray An RJ 45 10 100 1000 bps user LAN port for performing ...

Страница 89: ...on the same network segment as the SVP and storage system Note The SVP running Windows 10 operating system does not provide a way to disable Spanning Tree Protocol STP If your network has BPDU enabled to prevent loops connect the user LAN port on controllers 1 and 2 to an Ethernet switch instead of connecting them to SVP LAN 3 and LAN 4 ports Virtual SVP connectivity requires all of the following ...

Страница 90: ...red for storage system installation vary according to the specific storage system and network configuration Fibre Channel and iSCSI cables are used to connect the controllers to a switch or host Serial attached SCSI SAS cables are used to connect drive trays to controllers and other drive trays Appendix D Data and power cables Hitachi Virtual Storage Platform G900 Hardware Reference Guide 90 ...

Страница 91: ...ect the iSCSI 10 Gb RJ 45 ports on each controller to a host computer direct connection or to several host computers via an Ethernet switch SAS SAS optical Connects the controller to a drive tray or a drive tray to another drive tray Two SAS cables are provided with each drive tray Ethernet RJ 45 Four shielded Category 5e or 6a Ethernet cables are required for connecting the SVP to the controllers...

Страница 92: ...orts Fiber Channel connections to hosts For details about configuring FC host connections see the Provisioning Guide Note Due to high speed serial data transfer via Fibre Channel use high quality FC cables that comply with the Fibre Channel PH standard The following figure shows FC direct connection and FC connection through a switch Fibre Channel cables Appendix D Data and power cables Hitachi Vi...

Страница 93: ...Gbps 984 25 ft 300 m 1640 4 ft 500 m 3280 8 ft 10 km 4 Gbps 493 ft 150 m 1246 72 ft 380 m 1312 3 ft 400 m 8 Gbps 164 04 ft 50 m 493 ft 150 m 623 36 ft 190 m 16 Gbps 114 8 ft 35 m 328 08 ft 100 m 410 1 ft 125 m 32 Gbps 65 62 ft 20 m 229 7 ft 70 m 328 08 ft 100 m Fibre Channel cables Appendix D Data and power cables Hitachi Virtual Storage Platform G900 Hardware Reference Guide 93 ...

Страница 94: ...lent to DXLC 2P PC xxM GC50 125 2SR OMx 50 125 μm 62 5 125 μm Multimode Wavelength 850 nm LC connector LC connector LC LC cable longwave DXLC 2PS SPC xxM SMC 10 125 2SR 9 125 μm Singlemode Wavelength 1300 nm The following figure shows the connector used for optical interfaces Fibre Channel cables Appendix D Data and power cables Hitachi Virtual Storage Platform G900 Hardware Reference Guide 94 ...

Страница 95: ...ions to hosts For details about configuring iSCSI host connections see the Provisioning Guide Cable specifications for iSCSI optical interface Cable type Interface Cable mode name Nominal Cable Connector One side Other side LC LC cable Optical Equivalent to DXLC 2P PC xxM GC50 125 2SR OMx 50 125 mm Multimode Wavelength 850 nm LC connector LC connector iSCSI cables Appendix D Data and power cables ...

Страница 96: ...tor that connects the storage system optical iSCSI ports LC connector type Connector type LC duplex receptacle connector Interval 6 25 mm flat type two rows Cable specifications for 10 Gbps iSCSI copper interface iSCSI cables Appendix D Data and power cables Hitachi Virtual Storage Platform G900 Hardware Reference Guide 96 ...

Страница 97: ...bps 1000BASE T STP use an STP cable that suppresses radio noise RJ 45 Category 6a LAN cable 50 m 10 Gbps 10GBASE T STP use an STP cable that suppresses radio noise RJ 45 The following figure shows a 10 Gbps iSCSI cable iSCSI cables Appendix D Data and power cables Hitachi Virtual Storage Platform G900 Hardware Reference Guide 97 ...

Страница 98: ... RFC 1231 MIB II RFC 1757 RMON RFC 1901 SNMPv2 iSCSI specifications Item Specification Comments iSCSI target function Supported N A iSCSI target function Supported TrueCopy only iSCSI ports 2 per interface board VSP Gx00 models Maximum 32 per iSCSI system Connection methods Direct and switch connections Host connections 255 maximum per iSCSI port With Linux software initiator the maximum number de...

Страница 99: ...k aggregation Not supported N A Tagged VLAN Supported N A IPv4 Supported N A IPv6 Supported Note the following precautions When iSCSI Port IPv6 is set to Enabled if the IPv6 global address is set to automatic the address is determined by acquiring a prefix from an IPv6 router If the IPv6 router does not exist in the network the address cannot be determined As a result an iSCSI connection might be ...

Страница 100: ...e network equipment preventing the storage system from communicating through the new port number iSCSI name Both iqn3 and eui4 types are supported The unique iqn value is automatically set when a target is made iSCSI name is configurable Error recovery level 0 zero Error recovery by retrying from host Does not support Level 1 and Level 2 Header digest Supported Detects header error or data error w...

Страница 101: ...1 HiCommand Dynamic Link Manager Pass switching is achieved Not supported on Windows Vista and Windows 7 operating systems 2 IP Security Authentication and encryption of IP packets The storage system does not support IPsec 3 iqn iSCSI Qualified Name The iqn consists of a type identifier iqn a date of domain acquisition a domain name and a character string given by the individual who acquired the d...

Страница 102: ...nded bend radius The following table provides general guidelines for minimum bend radius values but you should consult the recommendation of your cable manufacturer Cable type Minimum bend radius values Fibre Channel 40 mm 1 73 inch iSCSI optical 40 mm 1 73 inch Category 5 Ethernet Four times the outside diameter of the cable SAS 40 mm 1 73 inch Managing cables Appendix D Data and power cables Hit...

Страница 103: ...e cables over time Therefore do not allow cables to sag through gaps in your supports Place drop points in your supports that permit cables to reach racks without bending or pulling Unintentional unplugging or unseating of a power cable can have a serious impact on the operation of an enterprise storage system Unlike data cables power connectors do not have built in retention mechanisms to prevent...

Страница 104: ...vides a variety of power cables that facilitate using storage systems around the world Hitachi power cables meet the safety standards for the country for which they are intended Power cable assemblies For information about racks and power distribution units PDUs refer to the Hitachi Universal V2 Rack Reference Guide Hitachi power cables consist of three parts Plug Male connector for insertion into...

Страница 105: ...00 240 10 16 CEI 23 50 Italy 200 240 10 16 CEI 23 50 7 Argentina 200 240 10 15 IRAM 2073 Australia 200 240 10 15 AS 3112 China 200 240 10 16 GB 1002 New Zealand 200 240 10 15 AS 3112 8 Denmark 200 240 10 DK 2 5 Israel 200 240 10 16 SI 32 94 Europe 200 240 CEE 7 7 105 India 200 240 6 16 IS 1293 South Africa 200 240 10 16 SABS 164 11 Switzerland 200 240 10 SEV 1011 126 International 200 240 20 IEC 3...

Страница 106: ...erland for a true 16 A application 7 4 wire three phase and earth Physical variations connector size and color indicate amperage rating 8 5 wire three phase earth and neutral Physical variations connector size and color indicate amperage rating AC connections The following table shows and describes the types of AC connections on your storage system Description Receptacle Input rating Reference sta...

Страница 107: ...t rating Reference standards BS 1363 200V 240V 5 BS 1365 3 IEC 83 AS 3112 200V 240V 6 AS C112 Cable and connector AC connections Appendix D Data and power cables Hitachi Virtual Storage Platform G900 Hardware Reference Guide 107 ...

Страница 108: ... any given time the voltage across the hot and neutral conductors can be anywhere between its peak maximum and zero Electrical conductors must be large to meet high amperage requirements Three phase power uses three cycles that are 120 degrees out of phase which never allows the voltage to drop to zero The more consistent voltage derived from the three hot conductors results in smoother current fl...

Страница 109: ...the device into the PDU Balance the electrical current load between available PDUs Americas single phase PDU 1P30A 8C13 3C19UL P The following figure and table describe the specifications of the PDU Figure 1 Americas PDU for the Hitachi Universal V2B Rack Single phase PDU 1P30A 8C13 3C19UL P Part Number Region Quantity Power input per PDU Power output per PDU Total rack amperage available 1P30A 8C...

Страница 110: ...le phase PDU 1P30A 15C13 3C19UL P Part number Region Quantity Power input per PDU Power output per PDU Total rack amperage available 1P30A 15C 13 3C19UL P Americas 4 rack 2 side Single phase 208V 30A 24A rated 60Hz Delta wYe N A NEMA L6 30P input power plug 4 5 m 14 76 feet cable 15 IEC C13 3 IEC C19 sockets Max allowable current 24A 5kVA 48A 10kVA Americas single phase PDU 1P30A 15C13 3C19UL P Ap...

Страница 111: ... 8C1 3 3C19UL P Americas 6 rack 3 side Three phase 208V 3P 30A 24A rated 60Hz Delta wYe Delta NEMA L15 30P input power plug 4 5 m 14 76 feet cable 8 IEC C13 3 IEC C19 sockets Max allowable current 38 4A 8kVA 115A 24kVA Americas three phase PDU 3P30A 15C13 3C19UL P The following figure and table describe the specifications of the PDU Americas three phase PDU 3P30A 8C13 3C19UL P Appendix E Power dis...

Страница 112: ...P 30A 24A rated 60Hz Delta wYe Delta NEMA L15 30P input power plug 4 5 m 14 76 feet cable 15 IEC C13 3 IEC C19 sockets Max allowable current 38 4A 8kVA 77A 16kVA Americas three phase PDU 3P30A 24C13 6C19UL P The following figure and table describe the specifications of the PDU Americas three phase PDU 3P30A 24C13 6C19UL P Appendix E Power distribution units for Hitachi Universal V2B Rack Hitachi V...

Страница 113: ... 24A rated 60Hz Delta wYe Delta NEMA L15 30P input power plug 4 5 m 14 76 feet cable 24 IEC C13 6 IEC C19 sockets Max allowable current 38 4A 8kVA 38 4A 8kVA APAC and EMEA single phase PDU 1P32A 9C13 3C19CE P The following figure and table describe the specifications of the PDU APAC and EMEA single phase PDU 1P32A 9C13 3C19CE P Appendix E Power distribution units for Hitachi Universal V2B Rack Hit...

Страница 114: ...25 6A rated 50Hz 60Hz Delta wYe N A IEC309 P N E input power plug 4 5 m 14 76 feet cable 9 IEC C13 3 IEC C19 sockets Max allowable current 25 6A 5 9kVA 77A 17 6kVA APAC and EMEA single phase PDU 1P32A 18C13 3C19CE P The following figure and table describe the specifications of the PDU APAC and EMEA single phase PDU 1P32A 18C13 3C19CE P Appendix E Power distribution units for Hitachi Universal V2B ...

Страница 115: ...A 25 6A rated 50Hz 60Hz Delta wYe N A IEC309 P N E input power plug 4 5 m 14 76 feet cable 18 IEC C13 3 IEC C19 sockets Max allowable current 38 4A 8 8kVA 77A 17 6kVA APAC and EMEA three phase PDU 3P16A 9C13 3C19CE P The following figure and table describe the specifications of the PDU APAC and EMEA three phase PDU 3P16A 9C13 3C19CE P Appendix E Power distribution units for Hitachi Universal V2B R...

Страница 116: ...2 8A rated 50Hz 60Hz Delta wYe wYe IEC309 3P N E input power plug 4 5 m 14 76 feet cable 9 IEC C13 3 IEC C19 sockets Max allowable current 38 4A 8 8kVA 115A 26 4kVA APAC and EMEA three phase PDU 3P16A 15C13 3C19CE P The following figure and table describe the specifications of the PDU APAC and EMEA three phase PDU 3P16A 15C13 3C19CE P Appendix E Power distribution units for Hitachi Universal V2B R...

Страница 117: ...12 8A rated 50Hz 60Hz Delta wYe wYe IEC309 3P N E input power plug 4 5 m 14 76 feet cable 15 IEC C13 3 IEC C19 sockets Max allowable current 38 4A 8 8kVA 77A 17 6kVA APAC and EMEA three phase PDU 3P32A 24C13 6C19CE P The following figure and table describe the specifications of the PDU APAC and EMEA three phase PDU 3P32A 24C13 6C19CE P Appendix E Power distribution units for Hitachi Universal V2B ...

Страница 118: ...ated 50Hz 60Hz Delta wYe wYe IEC309 3P N E input power plug 4 5 m 14 76 feet cable 24 IEC C13 6 IEC C19 sockets Max allowable current 77A 17 6kVA 77A 17 6kVA Americas APAC and EMEA three phase PDU 3P30A 243 69CE UL P The following figure and table describe the specifications of the PDU Americas APAC and EMEA three phase PDU 3P30A 243 69CE UL P Appendix E Power distribution units for Hitachi Univer...

Страница 119: ...icas APAC and EMEA 2 rack 1 side Three phase 400 415V max 30 32A 24A rated 50Hz 60Hz Delta wYe wYe IEC309 3P N E input power plug 4 5 m 14 76 feet cable 24 IEC C13 6 IEC C19 sockets Max allowable current 77A 17 6kVA 77A 17 6kVA Americas APAC and EMEA three phase PDU 3P30A 243 69CE UL P Appendix E Power distribution units for Hitachi Universal V2B Rack Hitachi Virtual Storage Platform G900 Hardware...

Страница 120: ... each other The area behind the storage system and between the vertical 19 inch mounting posts must be free of PDUs and cable loops Hitachi Universal V2 Rack rail kits Use rail kits to mount the Hitachi Virtual Storage Platform family storage system in a Hitachi Universal V2 Rack The following tables list the rail kit information for the specified storage systems Table 27 Rail kits for VSP Gx00 mo...

Страница 121: ...e size and weight of the DB60 dense intermix drive trays used with VSP Gx00 models pay close special attention when mounted in third party racks When mounting DB60 dense intermix drive trays in third party racks observe the following guidelines and see the following figure Use anti tilt floor plates or ceiling mounted fixing brackets to stabilize the rack Use a rack that is at least 40 94 in 1040 ...

Страница 122: ...Third party rack support for DB60 dense intermix drive trays Appendix F Non Hitachi racks Hitachi Virtual Storage Platform G900 Hardware Reference Guide 122 ...

Страница 123: ... mark Explanation Do not disassemble the equipment Be careful when handling heavy equipment Use caution when handling electrostatic sensitive equipment and microcircuitry Avoid placing any non essential objects or equipment onto the storage system Use caution when handling the equipment Use caution when handling equipment with movable parts Use caution when handling equipment with hot surfaces Use...

Страница 124: ...CBL controller CBL controller Appendix G Warning labels on the storage system Hitachi Virtual Storage Platform G900 Hardware Reference Guide 124 ...

Страница 125: ...Small form factor drive tray Small form factor drive tray Appendix G Warning labels on the storage system Hitachi Virtual Storage Platform G900 Hardware Reference Guide 125 ...

Страница 126: ...Large form factor drive tray Large form factor drive tray Appendix G Warning labels on the storage system Hitachi Virtual Storage Platform G900 Hardware Reference Guide 126 ...

Страница 127: ...Flash module drive tray Flash module drive tray Appendix G Warning labels on the storage system Hitachi Virtual Storage Platform G900 Hardware Reference Guide 127 ...

Страница 128: ...Dense intermix drive tray Dense intermix drive tray Appendix G Warning labels on the storage system Hitachi Virtual Storage Platform G900 Hardware Reference Guide 128 ...

Страница 129: ...CBL controller Dense intermix drive tray power supply CBL controller Appendix G Warning labels on the storage system Hitachi Virtual Storage Platform G900 Hardware Reference Guide 129 ...

Страница 130: ...dense intermix drive tray Battery Host port expansion chassis CMA used to secure dense intermix drive tray Appendix G Warning labels on the storage system Hitachi Virtual Storage Platform G900 Hardware Reference Guide 130 ...

Страница 131: ...PCIe switch board PCIe switch board Appendix G Warning labels on the storage system Hitachi Virtual Storage Platform G900 Hardware Reference Guide 131 ...

Страница 132: ...PCIe switch board Appendix G Warning labels on the storage system Hitachi Virtual Storage Platform G900 Hardware Reference Guide 132 ...

Страница 133: ...product Recycling A nickel metal hydride battery is used in the Cache Backup Battery A nickel metal hydride battery is a resource that can be recycled When you want to replace the Cache Backup Battery call the service personnel They will dispose of it for you This nickel metal hydride battery which is designated as recycling product by a recycling promotion low must be recycled The mark posted on ...

Страница 134: ... Regulatory compliance This equipment has been tested and certified for compliance with the following standards Appendix I Regulatory compliance Hitachi Virtual Storage Platform G900 Hardware Reference Guide 134 ...

Страница 135: ...ic emission certifications EN55022 2010 CE marking EU EN55024 2010 EN61000 3 2 2006 A1 A2 EN61000 3 3 2013 Safety certifications UL and CSA 60950 1 2007 cTuVus United States of America and Canada EN60950 1 2006 A1 1 A1 A12 A2 TUV Germany IEC60950 1 2005 A 1 A2 N A All CB countries IEC60950 1 2005 A 1 A2 S_Mark Argentina TP TC 004 2011 EAC Russia CNS 14336 1 BSMI Taiwan EN60950 1 2006 A1 1 A1 A12 A...

Страница 136: ... correct the interference at his own expense Testing was done with shielded cables Therefore in order to comply with the FCC regulations you must use shielded cables with your installation The electromagnetic interference EMI test was done in the following configuration If trouble occurs in another configuration a user might be requested to take appropriate preventative measures RKU CBL host port ...

Страница 137: ...antara Corporate Headquarters 2535 Augustine Drive Santa Clara CA 95054 USA HitachiVantara com community HitachiVantara com Contact Information USA 1 800 446 0744 Global 1 858 547 4526 HitachiVantara com contact ...

Отзывы: