![Hirschmann BAT 11b Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/hirschmann/bat-11b/bat-11b_management-manual_2138151012.webp)
2-12
BAT 11b
Release 1.0 03/04
U
Housing
Only technicians authorized by Hirschmann are permitted to open the
housing.
The device is grounded via the separated ground screw. It is located on
the bottom left of the front panel.
V
Make sure that the electrical installation meets local or nationally
applicable safety regulations.
V
The ventilation slits must not be covered to ensure free air circulation.
V
The distance to the ventilation slots of the housing has to be a
minimum of 10 cm.
V
Never insert pointed objects (thin screwdrivers, wires, etc.) into the
inside of the subrack! Failure to observe this point may result in injuries
caused by electric shocks.
V
The housing has to be mounted in upright position.
V
If installed in a living area or office environment, the device must be
operated exclusively in switch cabinets with fire protection
characteristics according to EN 60950.
U
Environment
The device may only be operated in the listed maximum surrounding air
temperature range at the listed relative air humidity range (non-
condensing).
V
The installation location is to be selected so as to ensure compliance
with the climatic limits listed in the Technical Data.
V
To be used in a Pollution Degree 2 environment only.
U
Qualification requirements for personnel
Qualified personnel as understood in this manual and the warning signs,
are persons who are familiar with the setup, assembly, startup, and
operation of this product and are appropriately qualified for their job. This
includes, for example, those persons who have been:
D
trained or directed or authorized to switch on and off, to ground and to
label power circuits and devices or systems in accordance with current
safety engineering standards;
D
trained or directed in the care and use of appropriate safety equipment
in accordance with the current standards of safety engineering;
D
trained in providing first aid.
Содержание BAT 11b
Страница 1: ...BAT 11b Management Manual Industrial ETHERNET Wireless LAN Access Point Access Client...
Страница 2: ......
Страница 3: ...BAT 11b Management Manual Industrial ETHERNET Wireless LAN Access Point Access Client...
Страница 8: ...2 8 BAT 11b Release 1 0 03 04...
Страница 10: ...2 10 BAT 11b Release 1 0 03 04...
Страница 16: ...2 16 BAT 11b Release 1 0 03 04...
Страница 24: ...Objectives 24 BAT 11b Release 1 0 03 04...
Страница 56: ...How to Exit the BAT Discovery 56 BAT 11b Release 1 0 03 04...
Страница 61: ...Status 61 BAT 11b Release 1 0 03 04 indicates the authentication status of each client according to IEEE802 1x...
Страница 82: ...Configuration Administration 82 BAT 11b Release 1 0 03 04...
Страница 103: ...Configuration Security 103 BAT 11b Release 1 0 03 04 Configuration Security...
Страница 108: ...Configuration Administration 108 BAT 11b Release 1 0 03 04...
Страница 124: ...How to Reset the Password 124 BAT 11b Release 1 0 03 04...
Страница 127: ......
Страница 128: ......