25
3
Channel Switching
Thoroughly read "Usage Notes" (p. 4) beforehand.
3.1 Inspection before Measurement
Verify that it operates normally to ensure that no damage occurred during storage or shipping.
If you find any damage, contact your authorized Hioki distributor or reseller.
Inspecting the device and peripheral devices
Check item
Action
Is the sheath of the power cord normal
without any damage or exposed metal part?
Damage may cause an electric shock or a short circuit
accident. Do not use it.
Contact your authorized Hioki distributor or reseller.
Are the sheaths of the measurement cables
or connection cables to be used normal
without any damage or exposed metal part?
Damage may cause an electric shock. Stop using it and
replace it with a specified one.
Is the device normal without any damage?
3
Channel Switching
3
Channel Switching
Содержание SW1001
Страница 2: ......
Страница 42: ...38 Precautions for Measurement...
Страница 48: ...44 Resetting Scan Operation...
Страница 50: ...46 Checking the Device Status...
Страница 52: ...48 Initialization Settings...
Страница 118: ...114 Sample Programs 3 Select File Save All 4 Check the save location and click Save as...
Страница 156: ...152 Outline Drawings 12 4 Outline Drawings SW1001 Unit mm Tolerance 0 2...
Страница 157: ...153 Outline Drawings SW1002 Unit mm Tolerance 0 2 12 Appendix...
Страница 158: ...154 Outline Drawings...
Страница 161: ...16 01 EN...
Страница 162: ......
Страница 163: ......
Страница 164: ......