
95
Checking External Control
7.4 Checking External Control
Input/output test (EXT. I/O test function)
The ON/OFF setting of output signals can be manually changed and the input signal status can be
checked in the screen.
1
Open the Setting screen.
[SET]
Select
2
Select the
[EXT I/O TEST]
.
Select
[EXEC]
Execute
3
Execute an EXT. I/O test.
Select
Turn ON the
[ON]
signal
Turn OFF the
[OFF]
signal
Return to the EXT. I/O setting screen
Output signal
Signals can be operated.
Input signal
The signal status is displayed.
NPN/PNP Switch status
IMPORTANT
• The TEST and VON signals cannot be manipulated using the EXT. I/O test function. To check
signals, start an actual insulation resistance test.
•
The LOAD0 to LOAD3 signals are finalized and displayed when the LOAD_VALID signal is
input.
External Control (EXT
. I/O)
HIOKI BT5525A961-00
Содержание BT5525
Страница 2: ...HIOKI BT5525A961 00 ...
Страница 6: ...Contents 6 HIOKI BT5525A961 00 ...
Страница 48: ...48 Notifying the Judgment Result and Test Completion with a Beep HIOKI BT5525A961 00 ...
Страница 76: ...76 Initializing the Instrument Reset HIOKI BT5525A961 00 ...
Страница 82: ...82 Deleting Panel Data HIOKI BT5525A961 00 ...
Страница 200: ...200 License Information HIOKI BT5525A961 00 ...
Страница 215: ...www hioki com HIOKI BT5525A961 00 ...