2.1 Pre-Operation Inspection
20
Operation Check
If the operation check reveals any abnormalities,
stop the check immediately and do not use the
instrument.
Required equipment:
• Model 3257-50/51 (this instrument)
• Model L9207-10 TEST LEAD
• AC power receptacle
(100 V AC 50/60Hz commercial power supply)
1.
Set the function switch to the continuity check. (
).
2.
Connect the red test lead to the V terminal, and
the black test lead to the COM terminal.
2.1 Pre-Operation Inspection
Black
Red
Содержание 3257-50
Страница 1: ...3257 51 DIGITAL HiTESTER 3257 50 Instruction Manual June 2012 Revised edition 9 3257C981 09 12 06H...
Страница 2: ......
Страница 46: ...3 7 Memory Function 42...
Страница 57: ......
Страница 58: ......