3.1 Initial Instrument Preparations
38
2
Apply the appropriate labels to the voltage measurement and clamp
sensor leads
3
Attach the strap
Before applying the labels
Wipe any dust from the surface around the
terminals, and ensure that it is dry.
Measurement lead labels
Apply the same color labels
as the input terminals to the
corresponding voltage and
clamp sensor leads.
Apply labels to
both ends of the
voltage cords
Apply labels to
both ends of
the clamp sen-
sor leads.
White
Green
Gray
Black
Brown
Blue
Yellow
Red
There are four measurement lead labels of each color.
Use the strap to avoid dropping the instrument while carrying, or when you need to
hang it on a hook.
Feed the strap through the buckle so
that it is tight and not twisted.
2
Feed the strap through
the buckle
Put the end of the
strap under the retain-
ing loop.
3
Push the strap through
one of the strap holes
on the instrument.
Repeat the same procedure with the other end of the strap and the other strap
hole.
Attach the strap carefully.
If it is not attached correctly, the instrument may be damaged by accidental
dropping.
1
4
Strap Hole
Содержание 3197
Страница 1: ...3197 POWER QUALITY ANALYZER May 2012 Revised edition 7 3197A981 07 12 05H Instruction Manual ...
Страница 2: ......
Страница 8: ...Contents vi ...
Страница 30: ...1 3 Measurement Flowchart 22 ...
Страница 44: ...2 5 Internal Operating Status and Memory Usage 36 ...
Страница 86: ...4 6 Initializing the Instrument System Reset 78 ...
Страница 117: ...6 3 Viewing Anomalous Phenomena EVENT screen 109 6 Viewing the INRUSH Screen DETAILS WAVEFORM INRUSH ...
Страница 134: ...6 4 Viewing Recorded Data REVIEW State 126 ...
Страница 139: ...7 2 Installing JRE 131 7 5 When the installation process has completed successfully click Finish Click ...
Страница 176: ...9 4 Disposing of the Instrument 168 ...
Страница 199: ......
Страница 200: ...3197 POWER QUALITY ANALYZER May 2012 Revised edition 7 3197A981 07 12 05H Instruction Manual ...