Chapter 2 Installation Preparations
Introduction
This chapter introduces the preparations before installing the SG-6000 A-Seriesnew series NIPS
device, including the installation site environment requirements, cabinet and rack requirements,
and unpacking. This chapter includes the following sections:
l
Installation site environment requirements
l
l
l
l
Installation Site Environment Requirements
The SG-6000XAnew NIPS-Series device is designed for indoor use. To ensure the normal oper-
ation and to prolong the service lifetime, the installation site must meet the requirements below.
Temperature/Humidity Requirements
The ambient temperature and relative humidity in the installation site should be maintained at
acceptable levels. The requirements are shown as below:
Item
Requirements
Ambient Tem-
perature
When the device is working, the requirement is
between 0℃ and 40℃;
When the device is being stored, the requirement is
between -20℃ and 70℃.
Relative Humidity
10%-95%, non-condensing
Chapter 2 Installation Preparations
60
Содержание SG-6000 X Series
Страница 1: ...Hillstone SG 6000 X Series Hardware Reference Guide TechDocs docs hillstonenet com...
Страница 11: ...Troubleshooting the Configuration System 156 Appendix Supported Versions of Devices 158 TOC 9...
Страница 38: ...SCM 260 SCM D1T 260 SCM D2T 260 is shown as below SCM 100 SCM 20 is shown as below 26 Chapter 1 Product Profile...
Страница 40: ...SSM 100 SSM 80 is shown as below SSM 20 is shown as below 28 Chapter 1 Product Profile...
Страница 45: ...IOM 16SFP 100 is shown as below IOM 4XFP 100 is shown as below Chapter 1 Product Profile 33...
Страница 48: ...SIOM P100 300 is shown as below SIOM P100 260 is shown as below 36 Chapter 1 Product Profile...
Страница 80: ...Chapter 2 Installation Preparations 68...
Страница 83: ...71 Chapter 2 Installation Preparations...
Страница 84: ...Chapter 2 Installation Preparations 72...
Страница 85: ...73 Chapter 2 Installation Preparations...