For information on Care and Cleaning or to register your
SEQUOIA
PROFESSIONAL
product by highwood , please visit
www.highwood-usa.com
.
SEQUOIA
PROFESSIONAL
by
high
wood
PERGOLA ASSEMBLY
PAGE 15 of 16
24) Place the Main Beam Spacer
Between the Lower Support Beams
as Shown Above to Maintain the
Correct Beam Spacing.
25) Place the (5) Joists on Top
of the Lower Support Beams, with
the 45 Angle Facing Down, and
Centering them Over the Black
Metal Brackets On the Lower
Support Beams.
26) Use the Joist Index to Set the
Distance Each Joist Overhangs the
Lower Support Beam. Place the Joist
Index Against the Lower Support
Beam as Shown and Slide the Joist
Until the 45 Cut Rests Against the
Joist Index.
Joist Index
Main Beam
Spacer
27) Secure Each Joist to the Lower Support Beams
Using (4) E Screws. Center Each Joist Over Each Black
Metal Bracket on the Lower Support Beams. This will Set
the Center-to-Center Spacing of the Joists. Place a
Screw Through the Hole in the Metal Bracket and Secure
it Into the Bottom of the Joist.
Quick Tip: Drilling a Shallow
1
8
" Diameter Pilot Hole Into
Each Location on the Joists will Allow for Easier
Installation of the Screws.
E Screw
E Screw
CM-PGLA-1212
04.30.21
Joist
Lower Support
Beam