34
Scheduler
To enter the Scheduler, select Schedule a Task on the SHI page
The Scheduler enables you to schedule disk/array checkups to ensure disks/array are functioning
optimally.
How to Create a New Verify Task
All arrays will appear under New Verify Task
1.
Log into the rDrive Manager
2.
Select the proper controller from the top left drop down
3.
Click SHI
4.
Click Schedule a task
5.
Select the array you want to schedule the verify task
6.
Type the name in Task Name entry box
7.
Choose how you want to schedule
8.
One time verify task on specific date (YYYY-MM-DD) at (HH:MM:SS, 24-hr clock)
9.
Or a specific schedule you can adjust based on Daily, Weekly, or Monthly options
10.
Click Submit
11.
Your entry will appear under Tasks List
Note: New Verify Task box only appears if you have normal status arrays. If you have a critical array,
New Rebuild Task will replace New Verify Task.