a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Do one of the following:
• Server in tower mode:
Position the tower server for hardware configuration.
Extend the server from the rack.
7. Remove the fan cage:
a. Open the blue latches to a 90° angle.
b. Use the latches to pull up the fan cage out of the chassis.
Install the fan cage
Procedure
1. Observe the guidelines for managing cables.
2. Make sure that all the system cables that are routed through the front cable channel are properly secured in the metal
cable tabs. This is done to prevent system damage due to cables being inadvertently caught under the fan cage.
Operations
47
Содержание ProLiant ML350 Gen10
Страница 26: ...SFF drive bay numbering Smart Array controller Tower orientation Rack orientation 26 Component identification ...
Страница 27: ...SFF drive bay numbering SAS expander Tower orientation Rack orientation Component identification 27 ...
Страница 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Страница 31: ...Component identification 31 ...
Страница 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Страница 55: ...10 Secure the rear end of rack rails to the rack columns with the rear shipping screws Operations 55 ...
Страница 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...